Modifications in the contract specifications of commodity derivatives contracts
SEBI/HO/CDMRD/DOP/CIR/P/2019/135
Cited by 1 instrument
SEBI circulars call their numbered units paras or clauses, interchangeably (“clause 4 of the circular”, “para 22 of the Master Circular”); Neolex cites them as paras.
- Issued on
- 14 November 2019
- Status
- Subsumed on 4 August 2023 into the Master Circular for Commodity Derivatives Segment (4 August 2023)
- Amended by
- —
- Amends
- Permission for trading in futures contracts and modification in contract specifications at exchange level (20 September 2016)
CIRCULAR
SEBI/HO/CDMRD/DOP/CIR/P/2019/135 November 14, 2019
To,
The Managing Directors/Chief Executive Officers
All Recognized Stock Exchanges having Commodity Derivatives Segment
Sir/Madam,
Subject: Modifications in the contract specifications of commodity derivatives contracts
SEBI vide its circular ref. no. SEBI/HO/CDMRD/CIR/2016/88 dated September 20, 2016 had inter-alia prescribed at Para 3(c) provisions regarding permission to allow modifications in contract specifications at the exchange level.
In order to streamline the process and after consultation with the exchanges, it has been decided to categorise the modifications in contract specification parameters in the following three categories:
Category A: Non-material modifications which can be made at the exchange level in yet to be launched and running contracts.
Category B: Material modifications which can be made at the exchange level in yet to
modifications shall require approval from Product Advisory Committee and approval of Regulatory Oversight Committee to be obtained post facto.
| be launched contracts or running contracts which have nil open interest. | These |
Category C: Material modifications which can be made only after approval from SEBI. These modifications shall require deliberations and approval from Product Advisory Committee and Regulatory Oversight Committee before seeking permission from SEBI.
The list of various contract specification parameters as per the above stated categories along with the timelines for advance intimation of modification to SEBI and market participant is given at Annexure I.
The permission to modify contract specification parameters of commodity derivatives contracts is subject to the condition that before introduction of any modification in contract specifications the Exchanges shall inform SEBI and market participants along with reasons for the modifications as per the timeline mentioned in Annexure I. However, this shall not apply to certain modifications which are required to be effected immediately considering the exigencies of the situation as per surveillance measure.
The Circular ref. no. SEBI/HO/CDMRD/CIR/2016/88 dated September 20, 2016 stands amended to this effect.
The provisions of this circular shall be effective from December 01, 2019.
This Circular is issued in exercise of powers conferred under Section 11(1) of Securities and Exchange Board of India Act, 1992, read with Section 10 of the Securities Contracts (Regulation) Act, 1956 to protect the interests of investors in securities and to promote the development of, and to regulate the securities market.
This circular is available on SEBI website at www.sebi.gov.in under the category ‘Circulars’ and “Info for Commodity Derivatives”.
Yours faithfully,
Priyanka Mahapatra
Deputy General Manager
Division of Products
Commodity Derivatives Market Regulation Department
+91-22-26449274
priyankam@sebi.gov.in
Annexure ICategorisation of contract specification parameters in commodity derivatives contracts Category Type of Modification Parameter Number of days of advance intimation to be given to SEBI and market participants
| Category A Non-material | Symbol | 10 days |
modifications which can Description
be made at the exchange
| Contract | Commencement | |||
| level | in | yet | to | be Day(Y/L) |
| launched and | running | |||
| contracts | Quotation/Base value (Y/L) | Maximum Order Size Tick Size (Minimum Price Movement) Strike Interval (Y/L) Number of Strikes Initial Margin Extreme Loss Margin Delivery Period Margin Pre-expiry Margin Other Margins Underlying Quotation (Y/L) | ||
| Category B Material | modifications Last | Trading | Day /Due 30 days |
which can be made at the Date/Expiry Date#
exchange level in yet to
Trading Unit be launched contracts or
Price Quote (Basis) running contracts which have nil open interest. Delivery Centre
from Product Advisory
| These | modifications Delivery Unit |
| shall require | approval Additional Delivery Centre(s) |
Quality Specifications Committee and approval
Quantity Variation of Regulatory Oversight
| Committee | to be Tolerance Limit |
| obtained post facto. | Trading Session |
Premium/Discount
(basis)
Position
which can be made only Trading Period
after approval from SEBI.
| Underlying | Price | Quote |
| Maximum | Allowable | Open |
| Category C Material | modifications Contract Launch Calendar | 30 days |
Daily Price Limit
| These | modifications |
Delivery Logic
Advisory Committee and settlement Method Exercise
| shall | require | ||
| deliberations | and Settlement | of | Contract/ |
| approval from Product Settlement | Logic/Final |
| Regulatory | Oversight of Options |
| Committee | before |
Mechanism of Exercise seeking permission from
SEBI.
Settlement Price)
| Due | Date | Rate | (Final |
Tender Period
Start Date of Near Month
Period/Tender Period
| Staggered | Delivery |
Option Type
(Y/L)-Modification can only be carried out in yet to be launched contracts
#-Changes in due date/expiry date may be required to be done in the running contracts in the event of
SEBI/HO/CDMRD/DRMP/CIR/P/2016/90 dated September 21, 2016 prescribes that Exchange may
advance expiry date of running contract in case physical market is closed in the notified basis centre
on the expiry day of the contract, due to festivals, strikes, erratic weather conditions, etc. Decision
about advancing expiry of running contract shall be intimated to the trade participants at least 10 days
before the revised expiry date.
| sudden | closure | of | markets | on | expiry | date. | SEBI | Circular | ref. | no. |