System Audit of Professional Clearing Members (PCMs)
SEBI/HO/MRD/TPD/P/CIR/2024/84
Cited by 1 instrument
Cites 1 instrument
SEBI circulars call their numbered units paras or clauses, interchangeably (“clause 4 of the circular”, “para 22 of the Master Circular”); Neolex cites them as paras.
- Issued on
- 20 June 2024
- Status
- Subsumed on 30 December 2024 into the Master Circular for Stock Exchanges and Clearing Corporations (30 December 2024)
- Amended by
- —
- Amends
- —
CIRCULAR
SEBI/HO/MRD/TPD/P/CIR/2024/84 June 20, 2024
To,
All Clearing Corporations,
All Professional Clearing Members
Dear Sir / Madam,
System Audit of Professional Clearing Members (PCMs)
SEBI vide Master Circular No. SEBI/HO/MRD2/PoD-2/CIR/P/2023/171 dated October 16, 2023 at Clause 8.2 of Chapter 2 has specified the comprehensive framework for System Audit of Stock Brokers(SBs)/Trading Members(TMs).
Based on the discussions with Clearing Corporations (CCs) and Technical Advisory Committee (TAC) of SEBI, it has been decided to devise the framework for system audit of Professional Clearing Members (PCMs).
In view of the same, PCMs are required to conduct System Audit as per the framework enclosed as Annexure 1 and Terms of Reference (TOR) enclosed as
Annexure 2. PCMs are also required to maintain a list of all the relevant SEBI and CCs circulars/ directions/ advices, etc. pertaining to technology and compliance thereof, as per format enclosed as Annexure 3 and the same shall be included under the scope of System Audit.
PCMs are also required to submit information with regard to exceptional major Non-Compliances (NCs)/ minor NCs observed in the System Audit as per format enclosed as Annexure 4 and are required to categorically highlight those observations/NCs/suggestions pointed out in the System Audit (current and previous) which remain open.
The Systems Audit report including compliance with SEBI/CCs circulars/guidelines and exceptional observation format along with compliance status of previous year observations shall be placed before the Governing Board of the PCM and then the report along with the comments of the Management of the PCM shall be communicated to CCs within one month of completion of audit.
All CCs are jointly advised to devise the appropriate uniform penalty structure for PCMs to ensure that system audit reports are submitted to them within defined timelines as well as audit observations are closed within defined timelines.
The provisions of the Circular shall come into force with immediate effect.The first audit shall be conducted for FY 2023-24.
The circular is issued with the approval of the competent authority.
This circular is being issued in exercise of the powers conferred by Section 11(1) of Securities and Exchange Board of India Act, 1992 to protect the interest of investors in securities market and to promote the development of, and to regulate the securities market.
This circular is available on SEBI website at www.sebi.gov.in at “Legal Framework –Circulars”.
Yours faithfully,
Ansuman Dev Pradhan
Deputy General Manager
Market Regulation Department
Email: ansumanp@sebi.gov.in
Encl.:
Annexure 1System Audit Framework
System Audit Framework
Audit Process
For the System Audit, the following broad areas shall be considered in order to ensure that the audit is comprehensive and effective:
The Audit shall be conducted according to the Norms,Terms of Reference (TOR) and Guidelines issued by SEBI/Clearing Corporations(CCs). Professional Clearing Members(PCMs) shall select the Auditors based on the prescribed Auditor Selection Norms and TOR. The Governing Board of the PCMs shall approve the appointment of the Auditors.
An Auditor can perform a maximum of 3 successive audits. However, such auditor shall be eligible for re -appointment after a cooling-off period of two years.
Further, during the cooling-off period, the incoming auditor may not include:
Any firm that has common partner(s) with the outgoing audit firm; and
Any associate / affiliate firm(s) of the outgoing audit firm which are under the same network of audit firms wherein the term "same network" includes the firms operating or functioning, hitherto or in future, under the same brand name, trade name or common control.
The number of years an auditor has performed an audit prior to this circular shall also be considered in order to determine its eligibility in terms of sub-clauses b and c above.
The scope of the Audit may be broadened by the Auditor to inter -alia incorporate any new developments that may arise due to issuance of circulars/ directions/ advice by SEBI/Clearing Corporat ion from time to time.
The audit shall be conducted for each financial year. Further, the audit shall be completed within 2 months from the end of the audit period. The Audit report shall be submitted to CCs within one month of completion of the Audit, after approval of the Governing Board (or equivalent governance structure as applicable to the entity) . PCMs, who have conducted clearing activities during the audit period are liable for submission of the System Audit report.
In the Audit report, the Auditor shall include its comments on whether the areas covered in the Audit are in compliance with the norms/ directions/ advices issued by SEBI, Clearing Corporation, internal policy of the PCM, etc. Further, the Audit report shall also include specific non-compliances (NCs), observations for minor deviations and suggestions for improvement. The audit report shall take previous audit reports into consideration and cover any open items therein. The Auditor should indicate if a follow-on audit is required to review the status of NCs.
For each of the NCs/ observations and suggestions made by the Auditor, specific corrective action as deemed fit may be taken by the PCM. The management of the PCM shall provide its comments on the NCs, observations and suggestions made by the Auditor, corrective actions taken or proposed to be taken along with time-line for such corrective actions.
The Audit report along with the comments of management shall be placed before the Governing Board (or equivalent governance structure as applicable to the entity) of the PCM. The Audit report along with comments of the Governing Board shall be submitted to Clearing Corporation, within one month of completion of audit.
The follow-on audit should be completed within one month of the corrective actions taken by the PCM. After the follow-on audit, the PCM shall submit a report to CC within one month from the date of completion of the follow-on audit. The report shall include updated Issue-Log to indicate the corrective actions taken and specific comments of the Auditor on the NCs and the corrective actions.
In cases wherein follow-on audit is not required, the PCM shall submit an Action Taken Report (ATR) to the Auditor. After verification of the ATR by the Auditor, the PCM shall submit a report to Clearing Corporation within one month from the date of completion of verification by the Auditor. The report shall include updated Issue-Log to indicate the corrective actions taken and specific comments of the auditor on the ATR.
The overall timeline from the last date of the audit period till completion of final compliance by PCM, including follow-on audit, if any, should not exceed 6 months. In exceptional cases, if PCM is of the view that compliance with certain observations may extend beyond said period, then the concerned PCM shall seek specific approval from the Governing Board.
The auditee team, who is responsible for direct liaison with the system auditor, at least one of the members must have thorough knowledge and experience in handling system audit.
Auditor Selection Norms
PCMs shall ensure compliance with the following norms while appointing Auditor:
Lead Auditor must have minimum 3 years of demonstrable experience in IT audit of securities market participants e.g. stock brokers, clearing
intermediaries, etc. and/ or financial services sector i.e. banking, insurance, Fin-tech etc.
| members, | exchanges, clearing corporations, depositories, |
The team performing system audit must have experience in / direct access to experienced resources in the areas covered under TOR. It is recommended that resources deployed by the Auditor for the purpose of system audit shall have relevant industry recognized certifications e.g. CISA (Certified Information Systems Auditor) from ISACA, CISM (Certified Information Securities Manager) from ISACA, GSNA (GIAC Systems and Network Auditor), CISSP (Certified Information Systems Security Professional) from International Information Systems Security Certification Consortium, commonly known as (ISC).
The Auditor shall have experience in working on Network audit/IT audit/governance/IT service management frameworks and processes conforming to industry leading practices like CobiT/ ISO 27001 and beyond.
The Auditor should have the capability to undertake forensic audit an d undertake such audit as part of system audit, if required.
The Auditor must not have any conflict of interest in conducting fair, objective and independent audit of the PCM. It should not have been engaged over the last three years in any consulting engagement with any departments / units of the entity being audited.
The Auditor should not have any cases pending against it, which point to its incompetence and/or unsuitability to perform the audit task.
The proposed audit agency must be empanelled with CERT-In on the date of appointment as auditor and date of submission of audit report .
Any criteria, in addition to the aforesaid criteria, that the PCM may deem fit for the purpose of selection of Auditor.
Audit Report Guidelines
The Audit report should cover each of the major areas mentioned in the TOR and compliance with SEBI and CC circulars/directions/advices, etc. related to technology. The Auditor in the Audit report shall give its views indicating the NCs to the standards or observations or suggestions. For each section, auditors should also provide qualitative inputs/suggestions about ways to improve the processes, based upon the best industry practices.
The report should also include tabulated data to show NCs / observations for each of the major areas in the TOR.
The audit report to include point -wise compliance of areas prescribed in TOR and areas emanating from relevant SEBI and CC circulars/directions/advices along with any accompanying evidence.
Evidences should be specified in the audit report while reporting/ closing an issue.
A detailed report with regard to the system audit shall be submitted to CC. The report shall include an Executive Summary as per the following format:
in compliance with various SEBI & Clearing Corporation circulars / norms and internal policies of PCM
Description of Describe the findings in sufficient detail, Auditor
Process/ Unit Process or unit where the audit is Auditor conducted and the finding pertains to
| Issue | Description | Responsibility |
|---|---|---|
| Major Area | Comprehensive identification of major areas Auditor/Auditee |
| Point wise | Point-wise list of areas/relevant clauses in Auditor |
| Compliance | TOR against which compliance is being audited (in tabular format). |
| Finding/ | referencing | any | accompanying | evidence |
| Observation | (e.g. procedure manual, interview notes, reports etc.) | |||
| Reference | Reference to the section in detailed report – Auditor where full background information about the findings are available |
| Category of | Major/Minor Non-compliance, Observation, Auditor |
| Findings | Suggestion etc. |
**********
Annexure 2Terms of Reference (TOR) for System Audit Program
System Audit Program – Terms of Reference (TOR)
The scope of audit shall encompass all the IT resources including hardware, software, network, policies, procedures etc. of PCMs (Primary Data Centre (PDC), Disaster Recovery Site (DRS) and Near Site (NS), if applicable).
IT environment
Organization details
Name
Address
IT team size (in house- employees)
IT team size (vendors)
IT and network set up and usage
PDC, DRS, NS and Regional/ Branch offices (location, owned/ outsourced), if applicable
Connectivity amongst PDC, NS and DRS, if applicable
IT infrastructure / applications pertaining to the activities done as a PCM.
System Architecture
Network architecture
Telecommunication network
IT Governance
Whether IT Governance framework exists to include the following:
IT organization structure including roles and responsibilities of key IT personnel;
IT governance processes including policy making, implementation and monitoring to ensure that the gove rnance principles are followed;
IT policies and procedures
Whether the organization has a defin ed and documented IT policy. If yes, is it approved by the Governing Board (GB)?
Is the current System Architecture, including infrastructure, network and application components describing system linkages and dependencies, documented?
Whether defined and documented Standard Operating Procedures (SOPs)/Policy for the following processes are in place.
IT Assets Acquisition
Access Management
Change Management
Backup and Recovery
Incident Management
Problem Management
Patch Management
Data Centre Operations
Operating Systems and Database Management
Network Management
DRS Operations
Data Retention and Disposal
Asset Inventory
Database security
Password Security
Archived and backed up data security
Whether the above mentioned SOPs/Policies are reviewed at periodic intervals or upon th e occurrence of any major event.
In this regard, whether any organization policy has been formulated by the PCM.
Business Controls
General Controls for Data Centre Facilities
Application Access – segregation of duties, database and application access etc. (Approved Policy clearly defining roles and responsibilities of the personnel handling business operations)
Maintenance Access – vendor engineers
Physical Access controls – permissions, logging, exception reporting & alerts
Environmental Controls – fire protection, AC monitoring, etc.
Fault Resolution Mechanism
Folder Sharing and Back Up Controls – safeguard of critical information on local desktops
Incidences of violations in the previous audit report and corrective action(s), if any, taken
Any other controls, as deemed fit, by the PCM
Risk Management System (RMS)
Risk management capability – The system auditor should check whether system of risk management including upfront real -time risk management if applicable is in place.
Back testing for effectiveness of RMS – Whether system has capability to identify trades which have exceeded the pre -defined limits (Order Quantity and Value Limits, Symbol wise User Order / Quantity limit, User / Branch Order Limit, Order Price limit) and also exceed ed corresponding margin availability of clients. Whether deviations from such pre -defined limits are captured by the system, documented and corrective step s taken.
Log Management – Whether the system maintains logs of alerts / changes / deletion / activation / deactivation of client codes and logs of changes to the risk management parameters mentioned above. Whether the system allows only authorized users to set the risk parameter in the RMS.
Software change control
Whether pre-implementation review of application controls (including controls over change management) was undertaken.
Adherence to secure Software Development Life Cycle (SDLC) / Software Testing Life Cycle (STLC) standards/ methodologies
Whether post implementation review of application controls was undertaken.
Is the review of processes to ensure data integrity post implementation of new application or system followed by implementation team?
User awareness
Processing of new feature request
Fault reporting / tracking mechanism & process for resolutions
Testing of New releases / Bug-fixes – Testing process (automation level)
Version Control – History, Change Management process etc.
Development / Test/ Production environment – Segregation
New Release in Production – Promotion, Release note approvals
Production Issues / disruptions reported in the previous audit report, root cause analysis & corrective actions taken, if any
Software Development Stage
Software Design to ensure adequate system capacity to enable functioning in a degraded manner in the event of a crash.
Software Testing framework, methodology and process guideline
Any other controls, as deemed fit, by the PCM
Data Communication/ Network Controls
Network Administration – Link, Path, Redundancy, No single point of failure, high availability, fault tolerance , Monitoring, breakdown resolution etc.
WAN Management – Connectivity provisions for business continuity.
Connection Permissions – Restriction on need to have basis
Incidences of access violations observed in the previous report & corrective actions taken, if any
Any other controls, as deemed fit, by the PCM
Security Controls
Email Archival Implementation
Anti-virus and malware controls
Access Policy and Controls
Defined and documented policies and procedures for managing access to applications and infrastructure –PDC, DRS, NS (if applicable) , branches (including network, operating systems and database) and approved by relevant authority
Review of access logs
Access rights and roles review procedures for all systems
Segregation of Duties (SOD) matrix describing key roles
Risk acceptance for violation of SOPs and alternate mechanism put in place
Privileged access to system and record of logs,
Periodic monitoring of access rights for privileged users
Authentication mechanisms used for access to systems including use of passwords, One Time Passwords (OTP), Single Sign on, etc.
BYOD (bring your own device) policies
Any other controls, as deemed fit, by the PCM
Performance Audit
Review of systems (hardware, software, network) performance over the period
Current system utilization
Business Continuity / Disaster Recovery Facilities
Business Continuity Planning (BCP) manual, including Business Impact Analysis (BIA), Risk Assessment and Disaster Recovery (DR) process, Roles and responsibilities of Incident Response Team (IRT) /Crisis Management Team (CMT ), if applicable, employees, support/outsourced staff.
Implementation of policies
Back-up procedures and recovery mechanism using back-ups.
Storage of Back-up (Remote site, DRS etc.)
Redundancy – Equipment, Network, Site etc.
DRS installation and Drills - Management statement on targeted resumption capability (in terms of time required & extent of loss of data)
Evidence of achieving the set targets during the DR drills in event of various disaster scenarios., if applicable
Debrief / review of any actual event when the DR/BCP was invoked during the year, if applicable .
User awareness and training
Is Recovery Time Objective (RTO) /Recovery Process Objective (RPO) during Business Impact Assessment (BIA) documented, if applicable?
Is review of BCP-DR undertaken annually or in case of major change in business/ infrastructure?
Testing of BCP-DR plan through appropriate strategies including simulations, DR drills, system recovery, etc.
IT/Network Support & IT Asset Management
Utilization Monitoring – including report of prior year utilization
Capacity Planning – including projection of business volumes
Capacity and performance management process for the network/systems
IT (S/W, H/W & N/W) Assets, Licenses & maintenance contracts
Comprehensive review of Assets life cycle management (Acquisition,
commissioning) and relevant records related to it.
| commissioning, | deployment, | monitoring, | maintenance | and | de |
Insurance
Disposal of Equipment, media, and other electronic waste as per applicable waste disposal guidelinesetc.
Segregation of Data and Processing facilities – The system auditor should check and comment on the segregation of data and processing facilities in case the member is also running other business.
Entity Specific Software used for or in support of trading/clearing systems / peripheral systems and critical processes .
Human Resources Management
Screening of Employee, Third party vendors / contractors
Onboarding
Offboarding
Consequence Management (Incident / Breach of policies)
Awareness and Trainings
Non-Disclosure Agreements (NDAs) and confidentiality agreement
The results of all testing that was conducted before deployment of any IT system/application in production environment, shall be checked by auditor during system audit.
IT Vendor Selection and Management
Identification of eligible vendors
Dissemination process of Request for Proposal (RFP)
Definition of criteria of evaluation
Process of competitive analysis
Approach for selection
Escrow arrangement for keeping source code
E-Mail system
Existence of policy for the acceptable use of electronic mail
Regulations governing file transfer and exchange of m essages with external parties
Rules based on which e-mail addresses are assigned
Storage, backup and retrieval
Redressal of Technological Complaints
Ageing analysis of technology complaints
Whether all complaints received are brought to their logical conclusion?
Any other Item(s)
Observation(s) based on previous Audit Report (s)
Any new direction/instruction that may be informed by Clearing Corporation and/or SEBI.
**********
Annexure 3Format for monitoring compliance with SEBI/CCs
circulars/guidelines/advisories related to Technology
Format for monitoring compliance with requirements emanating from SEBI and Clearing Corporation (CC) circulars/guidelines/advisories related to technology
| Sl. Date of | Subject Technological Mechanism Non | Compliance Comments of Time-line for | |||
|---|---|---|---|---|---|
| No. SEBI/CC | requirements put in place compliances status | the | taking | ||
| circular/ | specified by | by the | with | (Open/ | Management corrective |
| directions/ | SEBI/CC in | PCMs | SEBI/CC | closed) | action in case |
| advice, etc. | brief | circulars/ | of open | ||
| directions, | observations | etc. ******** |
Annexure 4Exception Observation Reporting Format
Exception Observation Reporting Format
Note: PCMs are expected to submit following information with regard to exceptional major non-compliances
(NCs) / minor NCs observed in the System Audit. PCMs should also categorically highlight those
observations/NCs/suggestions pointed out in the System Audit (current and previous) which are not yet
complied with.
Name of the PCM: ___________________
Name of the Auditor: _________________
Systems Audit Report Date: _________________
Table 1: For preliminary audit
| Manageme | Whether |
|---|
Corrective Deadline nt response similar issue
| Descri | Status/ Risk Rating | ||||
|---|---|---|---|---|---|
| Observat | Audit Root | Actions for the in case of was observed | |||
| Audit | ption Department Nature of finding | Impact | |||
| ion No. | TOR Cause | proposed corrective acceptance in any of the | |||
| period | of | of PCM | of | as per | Analysis |
| clause Analysis | by auditor action of | previous 3 | |||
| finding | finding Auditor | ||||
| associated | Audits |
risks
Description of relevant Table heads
Audit Period – This indicates the period of audit
Description of findings/observations – Description of the findings in sufficient details, referencing any
accompanying evidence
Status/ Nature of Findings – The category can be specified, for example:
Non-compliant (Major/Minor)
Work in progress
Observation
Suggestion
Risk Rating of finding - A rating has to be given for each of the observations based on its impact and severity to
reflect the risk exposure as well as the suggested priority for action
Represents weakness in control with respect to threat(s) that is /are sufficiently capable and impacts asset (s) leading to regulatory
| Rating | Description |
|---|
HIGH
non-compliance, significant financial, operational and reputational loss. These observations need to be addres sed with utmost priority.
Represents weakness in control with respect to threat(s) that is /are sufficiently capable and impacts asset (s) leading to e xposure in
MEDIUM
terms of financial, operational and reputational loss. These observations need to be addressed reasonable timeframe.
Represents weaknesses in control, which in combination with other weakness can develop into an exposure. Suggested
LOW
improvements for situations not immediately/directly affecting controls. .
Audit TOR clause – The TOR clause corresponding to this observation
Root Cause analysis – A detailed analysis on the cause of the non-conformity.
Impact Analysis – An analysis of the likely impact on the operations/ activity of the organization
Corrective Action – The action taken to correct the non-conformity
Table 2: For follow on/ follow up system audit
| Preliminary | Preliminary |
|---|
Deadline for the
| Audit | Preliminary | Corrective | Revised | Reason for delay in |
|---|---|---|---|---|
| Preliminary | Preliminary | Current | Current | Revised |
| Period Observation | Action as | Corrective | implementation/ | |
| Audit Date | Status | Finding | Status | Corrective |
| Number | proposed by | Action, if any | compliance |
Action Auditor
Description of relevant Table heads
1. Preliminary Status – The original finding as per the preliminary System Audit Report
2. Preliminary Corrective Action – The original corrective action as prescribed in the preliminary System audit report
3. Current Finding – The current finding w.r.t. the issue
4. Current Status – Current Status of the issue viz. compliant, non-compliant, work in progress (WIP)
5. Revised Corrective Action – The revised corrective action prescribed w.r.t. the Non-compliant/ WIP issues
************