Obligations

Compare across regulations →

What SEBI's regulations and master circulars require, read out of their text — 593 duties from 1 instrument — sorted as a compliance checklist: who must do what, how often, in what form, and what the text says follows a breach. Filter them, open any one to its provisions and history, and download or print the checklist.

← Another regulation or intermediary

How often
What the text specifies
Kind of duty, machine checks
Kind of duty
Can a machine check it?

4 duties · 2 partly computable · 2 with a check — filtered from 593

Group by
Checklist of the 4 shown
Tick the box beside a duty to build your own checklist.

Governance4

Chapter 16. — TRADING SOFTWARE AND TECHNOLOGY1

The system auditor, in covering BCP-DR as part of the mandated annual system audit, should check the preparedness of the market infrastructure institution to shift its operations from the PDC to the DRS unannounced, and comment on the documented results and observations of its DR drills.Para 16.4.3(i)(f)System auditor (of a stock exchange, clearing corporation or stock broker)Annual

ProcessTechnology, cyber security and continuityPolicies, controls and riskCompare across regulations →

Category
Governance
Frequency
Annual
Timeline
The text sets none
Format
None prescribed
XBRL
No
Penalty
None stated

What it requires

  • Check the MII's preparedness for an unannounced shift to the DRS and comment on its DR drills

From the provisions

  • Para 16.4.3(i)(f)

In Chapter 16. — TRADING SOFTWARE AND TECHNOLOGY

History

  1. 4 August 2023 Made

Can a machine check it?

Needs judgement (conduct). Preparedness is a judgement of the auditor.

Not yet reviewed · extracted by a model from the text · ob-cdmc-16-4-3-i-f-auditor-checks-dr-preparedness

Annexure Y — System and Network Audit Framework - Annexure Y2

The system and network audit must be conducted according to SEBI's norms, Terms of Reference and guidelines: its scope encompasses all the IT resources of the MII -- hardware, software, network, policies and procedures -- at the primary data centre, the disaster recovery site and the near site, and at least the areas of the TOR in Annexure Z (the IT environment; IT governance, policies and SOPs; business controls over data centre facilities, software change, data communication and network, security, access, electronic documents, performance, BCP-DR and IT assets; entity-specific software; human resources management; IT vendor selection; the e-mail system; technology complaints; earlier audit observations; any other area SEBI informs); the network audit covers the entire network infrastructure, with physical verification and tracing of connectivity paths, server configuration, wire-to-wire connectivity and the configuration of networking devices, a network diagram traced from the physical audit, link, path and device-level redundancy, no single point of failure, high availability and fault tolerance, the whole network connecting members (POP, MPLS, VSAT, co-location) and the applications, internal networks and servers used for trading, risk management, clearing and settlement; the auditor checks the results of all testing done before any IT system or application was deployed in production; and the TOR of the system audit of the commodity derivatives exchange includes an audit of the implementation of the cyber security and cyber resilience framework of Annexure ZD. The auditor may broaden the scope to take in new developments from SEBI's circulars, directions or advice.clause a of para 1 of Annexure Y; clause f of para 1 of Annexure Y; Annexure Z and 10 moreSystem auditor (of a stock exchange, clearing corporation or stock broker)AnnualFormat

ProcessTechnology, cyber security and continuityPolicies, controls and riskCompare across regulations →

Category
Governance
Frequency
Annual
Timeline
The text sets none
Format
Terms of Reference (TOR) in Annexure Z
XBRL
No
Penalty
None stated

What it requires

  • Conduct the system and network audit over the whole scope and at least the areas of the TOR
  • Check the results of all testing done before deployment of any IT system in production

From the provisions

  • clause a of para 1 of Annexure Y
  • clause f of para 1 of Annexure Y
  • Annexure Z
  • para 1 of Annexure Z
  • para 7 of Annexure Z
  • para 7.1 of Annexure Z
  • para 7.2 of Annexure Z
  • para 7.3 of Annexure Z
  • para 7.4 of Annexure Z
  • para 7.5 of Annexure Z
  • para 8 of Annexure Z
  • para 12.3 of Annexure Z
  • para 55) of Annexure ZD

In Annexure Y — System and Network Audit Framework - Annexure Y

Whom else it names

  • For the benefit of Recognised stock exchange, Recognised clearing corporation

History

  1. 4 August 2023 Made

Can a machine check it?

Needs judgement (conduct). Whether an audit covered its scope adequately is an auditor's and a reviewer's judgement.

Not yet reviewed · extracted by a model from the text · ob-cdmc-anxz-system-audit-scope-tor

In the system and network audit report the auditor must: comment on whether the areas audited comply with SEBI's norms, directions and advice and the MII's internal policy; set out the specific non-compliances, observations of minor deviations and suggestions, with qualitative inputs on improving the processes by best industry practice for each section; take earlier audit reports into account and cover their open items; say whether a follow-on audit is required; cover each major area of the TOR and the technology-related SEBI circulars point-wise, with the accompanying evidence, and with tabulated data of the non-compliances and observations by area; specify the evidence when reporting or closing an issue; and certify that the entire network architecture, connectivity (co-location included) and its linkage to the trading infrastructure conform to SEBI's framework for fair, equitable, transparent and non-discriminatory treatment of all market participants.clause h of para 1 of Annexure Y; para 3 of Annexure Y; para 4 of Annexure Y and 3 moreSystem auditor (of a stock exchange, clearing corporation or stock broker)AnnualFormat

ProcessTechnology, cyber security and continuityPolicies, controls and riskCompare across regulations →

Category
Governance
Frequency
Annual
Timeline
The text sets none
Format
Executive Summary format (issue log) in para 8 of Annexure Y
XBRL
No
Penalty
None stated

What it requires

  • Prepare the audit report with every element of paras 1(h) and 3 to 7 of Annexure Y
  • Certify the conformity of the network architecture and connectivity with SEBI's framework

From the provisions

  • clause h of para 1 of Annexure Y
  • para 3 of Annexure Y
  • para 4 of Annexure Y
  • para 5 of Annexure Y
  • para 6 of Annexure Y
  • para 7 of Annexure Y

In Annexure Y — System and Network Audit Framework - Annexure Y

Whom else it names

  • For the benefit of Recognised stock exchange, Recognised clearing corporation

History

  1. 4 August 2023 Made

Can a machine check it?

Partly computable (disclosure-present). That each required part is in the report is data; the adequacy of the findings and suggestions is a reviewer's.

Its check

What the check asks for
FieldTypeWhat it is
compliance_commentsbool
non_compliances_and_observationsbool
previous_open_items_coveredbool
follow_on_need_indicatedbool
pointwise_compliance_with_evidencebool
tabulated_findings_by_areabool
network_conformity_certifiedbool
reviewer_satisfied (optional)bool
Try this provision

Illustrative — not advice. The check reads only the figures you give it.

Not yet reviewed · extracted by a model from the text · ob-cdmc-anxy-auditor-report-contents

Annexure ZC — Stock Broker System Audit Framework – Annexure ZC1

The system auditor of a stock broker must cover, at the minimum, the areas of the ToR for the broker's type (Type I, II or III: system controls and capabilities, software change management, risk management system, smart order routing, algorithmic trading, password security, session management, database security, network integrity, access controls, backup and recovery, BCP/DR, segregation of data, back office data, user management, IT infrastructure management and software testing, as applicable), and the additional checks a particular exchange recommends; in its report it must specify the compliance or non-compliance status of each ToR area, observations on minor and major deviations and qualitative comments on the scope for improvement, take into consideration and cover the open items of earlier audit reports, indicate whether a follow-on audit is required to review the status of non-compliances, and follow the reporting standard for the executive summary to highlight the audit's major findings.para 5) of Annexure ZC; para 6) of Annexure ZC; para 8) of Annexure ZC and 7 moreSystem auditor (of a stock exchange, clearing corporation or stock broker)PeriodicFormat

ProcessTechnology, cyber security and continuityPolicies, controls and riskCompare across regulations →

Category
Governance
Frequency
Periodic
Timeline
The text sets none
Format
Executive Summary Reporting Format (preliminary and follow-on audit) in Annexure ZC
XBRL
No
Penalty
None stated

What it requires

  • Audit at least the ToR areas for the broker's type and the exchange's specific checks
  • Report the compliance status, deviations, open items and the need for a follow-on audit, with the executive summary in the reporting standard

From the provisions

  • para 5) of Annexure ZC
  • para 6) of Annexure ZC
  • para 8) of Annexure ZC
  • clause 4) of para 8) of Annexure ZC
  • sub-clause 12) of clause 4) of para 8) of Annexure ZC
  • item 16) of sub-clause 12) of clause 4) of para 8) of Annexure ZC
  • item c of item 17) of sub-clause 12) of clause 4) of para 8) of Annexure ZC
  • item 17) of item c of item 17) of sub-clause 12) of clause 4) of para 8) of Annexure ZC
  • item I of item c of item 18) of item c of item 17) of sub-clause 12) of clause 4) of para 8) of Annexure ZC
  • item II of item c of item 18) of item c of item 17) of sub-clause 12) of clause 4) of para 8) of Annexure ZC

In Annexure ZC — Stock Broker System Audit Framework – Annexure ZC

Whom else it names

  • For the benefit of Stock broker
  • Supervised by Recognised stock exchange

History

  1. 4 August 2023 Made

Can a machine check it?

Partly computable (disclosure-present). That each required part is in the report is data; whether the audit covered the ToR adequately is a reviewer's judgement.

Its check

What the check asks for
FieldTypeWhat it is
tor_areas_coveredbool
exchange_specific_checks_coveredbool
compliance_status_per_areabool
deviations_and_improvement_commentsbool
previous_open_items_coveredbool
follow_on_need_indicatedbool
executive_summary_in_standardbool
reviewer_satisfied (optional)bool
Try this provision

Illustrative — not advice. The check reads only the figures you give it.

Not yet reviewed · extracted by a model from the text · ob-cdmc-anxzc-5-8-auditor-report-and-tor

Illustrative, not advice. A duty is what the extraction read in a provision; the provision itself is the law. Duties extracted by a model stay “not yet reviewed” until an editor has read them against the text, and so do their categories, frequencies, formats and penalties.

APISettings