Obligations
Compare across regulations →What SEBI's regulations and master circulars require, read out of their text — 3,510 duties from 7 instruments — sorted as a compliance checklist: who must do what, how often, in what form, and what the text says follows a breach. Filter them, open any one to its provisions and history, and download or print the checklist.
← Another regulation or intermediary
237 duties · 109 computable · 26 partly computable · 135 with a check — filtered from 3,510
AIF Master Circular, 202630
Chapter 2 — Filing of PPM for launch of AIF scheme14
The PPM an AIF files with SEBI must follow the SEBI template, in two parts: Part A of minimum disclosures and Part B, a supplementary section for any further information; the template for Category I and II AIFs is at Annexure 1 and for Category III AIFs at Annexure 2. The template does not apply to Angel Funds, to Large Value Funds for Accredited Investors, or to an AIF or scheme in which each investor commits at least INR 70 crore (USD 10 million or equivalent for a non-INR commitment) and waives the template in the manner of Annexure 3.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- XBRL
- No
- Penalty
- None stated
What it requires
- Prepare and file the PPM in the SEBI template (Part A and Part B)
When it applies
- When Filing the PPM with SEBI
What it does not reach
- Unless Angel Funds
- Unless Large Value Funds for Accredited Investors
- Unless Each investor commits at least INR 70 crore (USD 10 million) and waives the template in the manner of Annexure 3
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Computable (disclosure-present). Whether the template is followed is recorded on the filing; the exemptions are a fund type, a commitment threshold and the waivers.
Its check
| Field | Type | What it is |
|---|---|---|
fund_type | string | angel, lvf or other |
ppm_in_template | bool | |
all_investors_waived (optional) | bool | |
smallest_commitment (optional) | decimal | |
commitment_currency (optional) | string | INR or USD (USD or equivalent) |
The limits in force today
- waiver min commitment inr 700000000 INR
- waiver min commitment usd 10000000 USD
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-1-ppm-in-sebi-template
Every AIF must include in its PPM the disciplinary history of the AIF, its sponsor and manager and their directors, partners, promoters and associates, and, where the applicant is a trust, of its trustees or trustee company and its directors: outstanding and past cases (where found guilty) of litigation, prosecution, disputes, unpaid statutory dues, defaults to banks, unprovided contingent liabilities (as in the books), economic or civil offence proceedings, adverse findings under securities laws, penalties and disputed tax liabilities (not personal ones of an individual), and any disciplinary action by SEBI or another regulator. The disclosure covers the last 5 years and, where a monetary penalty is involved, penalties above INR 5 lakh. Operational actions (administrative warnings, deficiency letters) may be grouped and summarised, but the AIF must give an investor the details of a summarised portion on request.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose the disciplinary history in the PPM
- Give an investor, on request, the details of the summarised operational actions
When it applies
- Within Matters of the last 5 years
- Threshold Monetary penalties above INR 5 lakh
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Partly computable (disclosure-present). The 5-year window and the INR 5 lakh threshold are mechanical; whether a matter is of a kind para 2.2.2 lists is a reading of the matter.
Its check
| Field | Type | What it is |
|---|---|---|
action_on | date | |
ppm_dated | date | |
disclosed_in_ppm | bool | |
monetary_penalty_inr (optional) | decimal | Only where the matter is a monetary penalty |
listed_kind (optional) | bool | The matter is of a kind para 2.2.2 lists |
The limits in force today
- lookback years 5 years
- penalty threshold inr 500000 INR
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-2-2-ppm-disciplinary-history
Any further litigation or case that arises in the course of the AIF's activities must be incorporated in the PPM and intimated to the investors.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Incorporate the new litigation or case in the PPM
- Intimate the investors of it
When it applies
- When A further litigation or case arises in the course of the AIF's activities
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). No time is set; whether a matter must be added is read from it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-2-2-update-ppm-for-new-litigation
From 30 July 2026 the substituted para 2.4 no longer states the duty to comply with SEBI's comments before launch (Regular schemes launch after 10 working days unless SEBI advises otherwise); regulation 12(3A) of the AIF Regulations still requires it.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- before the launch of the scheme
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Comply with SEBI's comments before the launch or the circulation of the PPM
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 The merchant banker or the AIF must comply with any comments SEBI provides during the 30-day period after filing before launching a non-LVF scheme or circulating its PPM.
- repealed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Needs judgement (conduct). The duty no longer applies from this date.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-4-comply-sebi-comments-before-launch
From 30 July 2026 the PPM of a Regular scheme (other than an LVF, an AI only fund or an Angel Fund) must be filed, at the time of registration or before the launch of a new scheme, on the SEBI Intermediary Portal with the applicable scheme fee and the same four documents -- the merchant banker's due diligence certificate (Annexure 6), the fit and proper declarations, the continuing interest declarations and copies of the PANs -- together with an Excel, Word or PDF file of the names and PANs of those entities and individuals.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- at registration or before the launch of the scheme
- XBRL
- No
- Penalty
- None stated
What it requires
- File the PPM of the Regular scheme on the portal with the fee, the four documents and the file of names and PANs
When it applies
- When Registration, or the launch of a new Regular scheme
From the provisions
- Para 2.4
- Para 2.4.1
- Para 2.4.1.2
- Para 2.4.1.2(i)
- Para 2.4.1.2(ii)
- Para 2.4.1.2(iii)
- Para 2.4.1.2(iv)
- the first item in para 2.7
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 The PPM of a non-LVF scheme (an Angel Fund's included, which regulation 19D(4) has filed through a merchant banker with its application for registration) must be filed through a SEBI registered merchant banker, at the time of registration or before the launch of a new scheme, on the SEBI Intermediary Portal with the applicable scheme fee and: the merchant banker's signed due diligence certificate in the format of Annexure 6; signed fit and proper declarations for the AIF, sponsor and manager under Schedule II of the Intermediaries Regulations; the sponsor's or manager's declarations on minimum continuing interest; and copies of the PANs of the AIF, its scheme, sponsor, manager, trustee, the directors or partners of the sponsor, manager and trustee, and the key investment team.
- Scope changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (disclosure-present). The channel, the fee and a fixed list of documents.
Its check
| Field | Type | What it is |
|---|---|---|
documents_filed | list<string> | Codes of the documents filed with the PPM |
scheme_fee_paid | bool | |
filed_via | string | si-portal or another channel |
The limits in force today
- required documents mb-due-diligence-certificate,fit-and-proper-declarations,continuing-interest-declarations,pan-copies,pan-list-file
- channel si-portal
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-4-file-ppm-with-mb-documents
From 30 July 2026 (GARUDA), an AIF may launch a new Regular scheme -- one other than an LVF, an AI only fund or an Angel Fund -- by circulating its PPM to investors only after 10 working days from filing the application with SEBI, unless SEBI advises otherwise; a first scheme may be launched from the date of grant of registration or after 10 working days from filing, whichever is later. Working days exclude Saturdays, Sundays and the public holidays on which the SEBI office concerned is closed.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- not before 10 working days from filing with SEBI
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch the Regular scheme only after 10 working days from filing with SEBI (and, for a first scheme, not before registration)
When it applies
- Within After 10 working days from filing the application with SEBI
- When A first scheme: not before the grant of registration
From the provisions
- Para 2.4
- Para 2.4.1
- Para 2.4.1.1
- Para 2.7
- the first item in para 2.7
- the second item in para 2.7
- the third item in para 2.7
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 Under the fast-track mechanism, an AIF may launch a new scheme other than an LVF (with Angel Funds, the 'non-LVF schemes') -- circulate its PPM to investors to solicit funds -- only after 30 days from filing the application with SEBI, unless SEBI advises otherwise; a first scheme may be launched from the date of grant of registration or after 30 days from filing, whichever is later.
- Threshold changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (deadline). A waiting period in working days from the filing, and the date of registration for a first scheme.
Its check
| Field | Type | What it is |
|---|---|---|
filed_on | date | |
launched_on | date | The day the PPM was circulated to investors for soliciting funds (para 2.7) |
first_scheme | bool | |
registration_granted_on (optional) | date | |
sebi_advised_otherwise (optional) | bool | |
holidays (optional) | list<date> | Days SEBI's office is closed |
The limits in force today
- wait days 10 working days
- day basis working
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-4-launch-after-waiting-period
From 30 July 2026 the duty runs for the PPMs of Regular schemes: the merchant banker must independently exercise due diligence on all the disclosures in the PPM, satisfy itself of their veracity and adequacy, and provide the due diligence certificate.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- XBRL
- No
- Penalty
- None stated
What it requires
- Independently exercise due diligence on the PPM's disclosures and provide the due diligence certificate
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 The merchant banker filing the PPM of a non-LVF scheme must independently exercise due diligence on all its disclosures, satisfy itself of their veracity and adequacy, and provide the due diligence certificate.
- Scope changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Needs judgement (conduct). Due diligence and adequacy of disclosure are judgements.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-4-mb-due-diligence-certificate
From 30 July 2026, for the PPMs of Regular schemes: the merchant banker and the manager are responsible for the accuracy and completeness of all disclosures in the PPM and in the declarations they submit; for any irregularity or lapse in the PPM the entities concerned are liable for action.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 2.4.1.5
What it requires
- Ensure the accuracy and completeness of the PPM's disclosures and of the declarations
If it is not met
- In case of any irregularity or lapse in the PPM, the concerned entities shall be liable for action.
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 The merchant banker and the manager of the AIF are responsible for the accuracy and completeness of all disclosures in the PPMs of non-LVF schemes and in the declarations they submit; for any irregularity or lapse in the PPM the entities concerned are liable for action.
- Scope changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Needs judgement (conduct). Accuracy and completeness are judged against the facts.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-4-mb-manager-liable-for-ppm-accuracy
From 30 July 2026 the PPM of every Regular scheme must disclose the details of the merchant banker and include the disclaimer clause in four parts: the merchant banker's due diligence and certificate (with its date); the confirmation by the manager and the merchant banker that the PPM complies with SEBI's laws, rules, regulations, circulars and guidelines and does not override or conflict with them; that submission to SEBI is not SEBI's approval; and that the manager and the merchant banker are responsible for the PPM being true and accurate in all material respects.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- Disclaimer clause set out in para 2.4.1.4
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose the merchant banker's details and include the four-part disclaimer in the PPM
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
History
- Made — until 30 July 2026 The PPM of every non-LVF scheme must disclose the details of the merchant banker and include the disclaimer clause the paragraph sets out: (1) the merchant banker has independently exercised due diligence and certified in its due diligence certificate that the disclosures are true, fair and adequate and accord with the AIF Regulations; (2) submission of the PPM to SEBI is not its approval by SEBI, which takes no responsibility for the disclosures or the manager's performance; (3) the manager and the merchant banker are responsible for the PPM being true and accurate in all material respects.
- Form changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (disclosure-present). The presence of the merchant banker's details and of each prescribed statement.
Its check
| Field | Type | What it is |
|---|---|---|
merchant_banker_disclosed | bool | |
disclaimer_clauses | list<string> | Codes of the disclaimer's statements in the PPM |
The limits in force today
- required clauses mb-due-diligence,compliance-with-sebi-laws,not-approved-by-sebi,manager-mb-responsibility
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-4-ppm-mb-details-and-disclaimer
From 30 July 2026, under the proviso to regulation 12(3A), AI only funds and LVFs are exempt from filing their PPM through a merchant banker and from incorporating SEBI's comments: they may launch a scheme immediately upon filing the PPM with SEBI, but their first schemes only from the date of grant of SEBI registration.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- on filing; a first scheme from the grant of registration
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch the AI only or LVF scheme on filing the PPM (a first scheme not before registration)
When it applies
- When A first scheme: not before the grant of registration
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 Under the provisos to regulation 12(2) and (3), an LVF is exempt from filing its PPM with SEBI through a merchant banker and from incorporating SEBI's comments: it may launch its scheme under intimation to SEBI.
- Scope changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (deadline). The launch is compared with the filing and, for a first scheme, the registration.
Its check
| Field | Type | What it is |
|---|---|---|
filed_on | date | |
launched_on | date | |
first_scheme | bool | |
registration_granted_on (optional) | date |
The limits in force today
- first scheme after registration true
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-5-ai-only-lvf-launch-on-filing
From 30 July 2026 the PPM of an AI only fund, an LVF or an Angel Fund must be filed on the SEBI Intermediary Portal, with the applicable scheme or registration fee and an undertaking, duly signed and stamped by the manager's Chief Executive Officer (or the person in the equivalent role) and its Compliance Officer, in the format of Annexure 7.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- with the filing of the PPM
- XBRL
- No
- Penalty
- None stated
What it requires
- File the PPM on the portal with the fee and the undertaking of Annexure 7 signed and stamped by the CEO and the Compliance Officer
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 While filing the PPM of an LVF scheme with SEBI, the manager must submit an undertaking, duly signed and stamped by its Chief Executive Officer (or the person in the equivalent role) and its Compliance Officer, in the format of Annexure 7.
- Scope changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (disclosure-present). The channel, the fee, and the signatories, stamp and format of the undertaking.
Its check
| Field | Type | What it is |
|---|---|---|
undertaking_signed_by | list<string> | ceo, compliance-officer |
undertaking_stamped | bool | |
undertaking_in_annexure_7 | bool | |
filed_via (optional) | string | |
fee_paid (optional) | bool |
The limits in force today
- required signatories ceo,compliance-officer
- portal and fee required true
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-5-ceo-co-undertaking-with-ppm
From 30 July 2026, after the SEBI (AIF) (Second Amendment) Regulations, 2026, an Angel Fund is exempt from filing its PPM through a merchant banker and from incorporating SEBI's comments, and may circulate its PPM to investors to solicit funds from the date SEBI grants it registration.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- One-time
- Timeline
- from the date of grant of registration
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Circulate the PPM to investors only from the date of grant of registration
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (deadline). The date of circulation against the date of registration.
Its check
| Field | Type | What it is |
|---|---|---|
registration_granted_on | date | |
ppm_circulated_on | date |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-5-angel-ppm-from-registration
From 30 July 2026 the PPM of every AI only fund, LVF and Angel Fund must include the disclaimer clause the paragraph sets out: (1) the manager has independently exercised due diligence, and its CEO and Compliance Officer have certified in their undertaking to SEBI that the disclosures are true, fair and adequate and accord with the AIF Regulations; (2) the PPM complies with SEBI's laws and does not override or conflict with them; (3) submission to SEBI is not SEBI's approval; (4) the manager is responsible for the PPM being true and accurate in all material respects.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- Disclaimer clause set out in para 2.5.2.4
- XBRL
- No
- Penalty
- None stated
What it requires
- Include the four-part disclaimer in the PPM
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
History
- Made by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (disclosure-present). The presence of each prescribed statement.
Its check
| Field | Type | What it is |
|---|---|---|
disclaimer_clauses | list<string> | Codes of the disclaimer's statements |
The limits in force today
- required clauses manager-due-diligence,compliance-with-sebi-laws,not-approved-by-sebi,manager-responsibility
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-5-2-4-disclaimer-ai-only-lvf-angel
From 30 July 2026 the manager of an AI only fund, an LVF or an Angel Fund is responsible for the accuracy and completeness of all disclosures in the PPM and in the declarations it submits; for any irregularity or lapse in the PPM the entities concerned are liable for action.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 2.5.2.5
What it requires
- Ensure the accuracy and completeness of the PPM's disclosures and of the declarations
If it is not met
- In case of any irregularity or lapse in the PPM, the concerned entities shall be liable for action.
From the provisions
In Chapter 2 — Filing of PPM for launch of AIF scheme
Whom else it names
- For the benefit of Investor
- Supervised by Securities and Exchange Board of India
History
- Made by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Needs judgement (conduct). Accuracy and completeness are judged against the facts.
Not yet reviewed · extracted by a model from the text · ob-aifmc-2-5-2-5-manager-liable-for-ppm-accuracy
Chapter 4 — Investment instrument/security specific conditions for AIFs1
An AIF may invest in units of other AIFs without calling itself a Fund of AIFs; an AIF that proposes to do so must state in its PPM, among other things, the proposed allocation to units of other AIFs, the part of the fees and expenses charged to investors attributable to it, the manager's process for complying with regulations 15 and 16, 17 or 18, and whether it will invest in units of AIFs managed or sponsored by the same manager or sponsor or their associates, with the details (allocation, fees, expenses).
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- State in the PPM the four matters on investment in units of other AIFs
When it applies
- When The AIF proposes to invest in units of other AIFs
From the provisions
In Chapter 4 — Investment instrument/security specific conditions for AIFs
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Read from the PPM.
Not yet reviewed · extracted by a model from the text · ob-aifmc-4-1-2-ppm-disclosures-for-fund-of-aifs
Chapter 6 — Framework for AIFs to make co-investment within the AIF structure1
Under regulation 17A(2), the manager must file a shelf placement memorandum, on the template of Annexure 10, setting out among other things the principal terms of co-investment, the governance structure and the regulatory framework for co-investment.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- XBRL
- No
- Penalty
- None stated
What it requires
- File the shelf placement memorandum on the template of Annexure 10
From the provisions
In Chapter 6 — Framework for AIFs to make co-investment within the AIF structure
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Read from the shelf placement memorandum.
Not yet reviewed · extracted by a model from the text · ob-aifmc-6-1-2-file-shelf-placement-memorandum
Chapter 7 — Operational and prudential norms for Category III AIFs2
For regulation 10(b), where the corpus of an open-ended scheme falls below INR 20 crore, the AIF must intimate SEBI within 2 working days of receiving the client's request for redemption.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- within 2 working days of receiving the redemption request
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 7.6.4
What it requires
- Intimate SEBI of the corpus falling below INR 20 crore
When it applies
- Threshold Corpus below INR 20 crore
If it is not met
- In case of repeated violations SEBI may take action against the AIF (para 7.6.4).
From the provisions
In Chapter 7 — Operational and prudential norms for Category III AIFs
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Computable (deadline). A corpus threshold and a two-working-day window.
Its check
| Field | Type | What it is |
|---|---|---|
corpus_after_redemption | decimal | |
redemption_request_on (optional) | date | |
intimated_on (optional) | date | |
holidays (optional) | list<date> | Holidays that are not working days |
The limits in force today
- corpus floor inr 200000000 INR
- window working days 2 working days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-7-6-1-intimate-sebi-corpus-breach
Where the corpus of an open-ended scheme falls below INR 20 crore, the AIF must take the necessary action to bring the scheme back to INR 20 crore within 3 months from the date of the breach.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- within 3 months from the date of the breach
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 7.6.4
What it requires
- Restore the scheme's corpus to INR 20 crore
When it applies
- Within Within 3 months from the breach
If it is not met
- In case of repeated violations SEBI may take action against the AIF (para 7.6.4).
- If the corpus is not restored in time, the AIF must redeem all units and wind up the scheme (para 7.6.3).
From the provisions
In Chapter 7 — Operational and prudential norms for Category III AIFs
Whom else it names
- For the benefit of Investor
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Computable (deadline). A three-month window and the restored corpus.
Its check
| Field | Type | What it is |
|---|---|---|
breach_on | date | |
restored_on | date | |
restored_corpus | decimal |
The limits in force today
- restore months 3 months
- corpus floor inr 200000000 INR
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-7-6-2-restore-corpus-in-3-months
Chapter 8 — Operational and prudential norms for Angel Funds3
From 30 July 2026 the twelve months run from the date the Angel Fund becomes eligible to launch under para 2.5.2.2.2 -- the date SEBI grants it registration; it must still on-board at least five Accredited Investors before the first close, and an Angel Fund existing on 10 September 2025 without a first close must declare it on or before 8 September 2026.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- One-time
- Timeline
- within 12 months from the grant of registration (existing Angel Funds: by 8 September 2026)
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 8.2.3
What it requires
- On-board at least five Accredited Investors and declare the first close
When it applies
- Threshold At least five Accredited Investors
- Within Within 12 months from the grant of registration
If it is not met
- If the first close is not declared in time, the Angel Fund must refile its PPM with SEBI and pay the fee again (para 8.2.3).
From the provisions
In Chapter 8 — Operational and prudential norms for Angel Funds
Whom else it names
- For the benefit of Accredited investor
History
- Made — until 30 July 2026 Under regulation 19D(6), an Angel Fund must on-board at least five Accredited Investors before declaring its first close, and must declare the first close not later than 12 months from the date it becomes eligible to launch its scheme under para 2.4.1 (30 days after filing, or registration if later); an Angel Fund existing on 10 September 2025 that has not declared its first close must do so on or before 8 September 2026.
- Threshold changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (deadline). A count and a twelve-month window (or a fixed date).
Its check
| Field | Type | What it is |
|---|---|---|
registered_on | date | |
first_close_on | date | |
accredited_investors_at_first_close | int | |
eligible_to_launch_on (optional) | date | The date the Angel Fund became eligible to launch: under para 2.4.1 as issued, the later of registration and 30 days after filing; under para 2.5.2.2.2 from 30 July 2026, the grant of registration |
The limits in force today
- first close months 12 months
- min accredited investors 5 investors
- existing fund registered by 2025-09-10
- existing fund deadline 2026-09-08
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-8-2-angel-first-close
If an Angel Fund does not declare its first close within the timeline of para 8.2, it must refile its PPM with SEBI under the AIF Regulations, paying the requisite fee to SEBI.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Refile the PPM with SEBI and pay the fee
When it applies
- When The first close is not declared within the timeline
From the provisions
In Chapter 8 — Operational and prudential norms for Angel Funds
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Needs judgement (conduct). The duty is the consequence of a missed first close.
Not yet reviewed · extracted by a model from the text · ob-aifmc-8-2-3-angel-refile-ppm
Under regulation 19G(4), the manager of an Angel Fund must disclose in the PPM a defined methodology for allocating an investment among the angel investors who approve it; the methodology must leave the manager no case-by-case discretion, and the manager must strictly adhere to it in allocating each investment among the consenting investors.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose a methodology without discretion in the PPM
- Allocate every investment strictly by it
From the provisions
In Chapter 8 — Operational and prudential norms for Angel Funds
Whom else it names
- For the benefit of Accredited investor
History
- Made
Can a machine check it?
Needs judgement (conduct). Whether a methodology leaves discretion, and whether it was followed, are read.
Not yet reviewed · extracted by a model from the text · ob-aifmc-8-7-angel-allocation-per-methodology
Chapter 9 — Norms for Special Situation Funds1
Each scheme of a Special Situation Fund -- a sub-category of Category I AIF investing in special situation assets under Chapter III-B -- must have a corpus of at least INR 100 crore.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Keep each scheme's corpus at INR 100 crore or more
When it applies
- Threshold Corpus of at least INR 100 crore
From the provisions
In Chapter 9 — Norms for Special Situation Funds
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (threshold). One amount against INR 100 crore.
Its check
| Field | Type | What it is |
|---|---|---|
scheme_corpus | decimal |
The limits in force today
- min corpus inr 1000000000 INR
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-9-1-ssf-scheme-corpus-100-crore
Chapter 12 — Timeline for first close and calculation of tenure of AIFs4
From 30 July 2026 the twelve months run from the date the AIF becomes eligible to launch the scheme under para 2.4.1.1 (a Regular scheme: 10 working days after filing, or the grant of registration if later) or para 2.5.2.1.1 (an AI only fund or an LVF: on filing, a first scheme from the grant of registration); the close of an open-ended Category III scheme's initial offer period is its first close, and an LVF scheme's first close stays within 12 months from registration or filing, whichever is later.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- One-time
- Timeline
- within 12 months from the date of eligibility to launch
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 12.1.6
What it requires
- Declare the scheme's first close
When it applies
- Within Within 12 months from eligibility to launch under paras 2.4.1.1 and 2.5.2.1.1
If it is not met
- If the first close is not declared in time, the AIF must file a fresh application for the launch of the scheme and pay the fee again (para 12.1.6).
From the provisions
In Chapter 12 — Timeline for first close and calculation of tenure of AIFs
Whom else it names
- For the benefit of Investor
History
- Made — until 30 July 2026 Under regulation 12(4), an AIF must declare the first close of a scheme not later than 12 months from the date it becomes eligible to launch the scheme under para 2.4.1 (30 days after filing, or the grant of registration if later); for an open-ended Category III scheme the first close is the close of its initial offer period; the first close of an LVF scheme must be declared within 12 months from the grant of registration or the filing of its PPM with SEBI, whichever is later.
- Threshold changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (deadline). A twelve-month window from a fixed date.
Its check
| Field | Type | What it is |
|---|---|---|
scheme_type | string | lvf or other |
first_close_on | date | |
eligible_to_launch_on (optional) | date | |
registration_granted_on (optional) | date | |
ppm_filed_on (optional) | date |
The limits in force today
- first close months 12 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-12-1-first-close-within-12-months
The corpus of a scheme at the time it declares its first close must not be less than the minimum corpus the AIF Regulations set for its category or sub-category.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- One-time
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Have at least the minimum corpus at the first close
From the provisions
In Chapter 12 — Timeline for first close and calculation of tenure of AIFs
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (threshold). One amount against the regulation's minimum (given as an input).
Its check
| Field | Type | What it is |
|---|---|---|
corpus_at_first_close | decimal | |
minimum_corpus | decimal | The minimum corpus of the category, INR |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-12-1-3-corpus-at-first-close
If the first close of a scheme is not declared within the timeline of para 12.1, the AIF must file a fresh application for the launch of the scheme under the AIF Regulations, paying the requisite fee to SEBI.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- File a fresh application for the launch, with the fee
When it applies
- When The first close is not declared in time
From the provisions
In Chapter 12 — Timeline for first close and calculation of tenure of AIFs
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Needs judgement (conduct). The duty is the consequence of a missed first close.
Not yet reviewed · extracted by a model from the text · ob-aifmc-12-1-6-fresh-application-if-no-first-close
A scheme that had declared its first close on or before 17 November 2022 may keep calculating its tenure from its final close; such a scheme that has yet to declare its final close must declare it within the timeline in its PPM, and neither the AIF nor its manager has any discretion to extend that timeline.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- One-time
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Declare the final close within the PPM's timeline, without extension
From the provisions
In Chapter 12 — Timeline for first close and calculation of tenure of AIFs
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). Two dates against the PPM's timeline.
Its check
| Field | Type | What it is |
|---|---|---|
first_close_on | date | |
final_close_on (optional) | date | |
ppm_final_close_deadline (optional) | date |
The limits in force today
- first close by 2022-11-17
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-12-2-3-legacy-final-close-per-ppm
Chapter 17 — Obligations of manager, sponsor, investment committee and trustee of AIFs1
An AIF must disclose in its PPM the names of all the key management personnel of the AIF and of its manager -- the members of the manager's key investment team as disclosed in the PPM; the employees involved in decision-making for the AIF, including senior management at the level of Managing Director, CEO, CIO, whole-time director or equivalent; and anyone the AIF (through its trustee, board or designated partners) or the manager declares to be key management personnel.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Name all key management personnel of the AIF and its manager in the PPM
From the provisions
In Chapter 17 — Obligations of manager, sponsor, investment committee and trustee of AIFs
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Who is key management personnel is read from the organisation.
Not yet reviewed · extracted by a model from the text · ob-aifmc-17-1-3-kmp-names-in-ppm
Chapter 21 — Periodic reporting requirements for AIFs2
Changes in the terms of the PPM and in the documents of the fund or scheme must be intimated to the investors and to SEBI on a consolidated basis within one month of the end of each financial year; the intimation must specifically mention the changes carried out in the PPM and the documents, with the relevant pages of the revised sections or clauses.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Reporting to Unitholders / Shareholders
- Frequency
- Annual
- Timeline
- within 1 month of the end of each financial year
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Intimate the year's changes to the investors and SEBI on a consolidated basis, with the relevant pages
When it applies
- Within within 1 month of the end of each financial year
From the provisions
In Chapter 21 — Periodic reporting requirements for AIFs
Whom else it names
- For the benefit of Investor
- Supervised by Securities and Exchange Board of India
History
- Made
Can a machine check it?
Computable (deadline). One month from the year's end is counted from dates.
Its check
| Field | Type | What it is |
|---|---|---|
year_ended_on | date | |
changes_made (optional) | bool | |
intimated_on (optional) | date | |
assessed_on (optional) | date |
The limits in force today
- intimate within months 1 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-21-4-1-annual-ppm-changes-intimation
The intimation to SEBI of changes in the terms of the PPM must be filed through a merchant banker -- one that is not an associate of the AIF, its sponsor, manager or trustee -- with the merchant banker's due diligence certificate in the format of Annexure 15; changes in the terms of the PPM listed in Annexure 16 may instead be filed directly with SEBI. From 30 July 2026 AI only funds, large value funds and angel funds are exempt from intimating changes through a merchant banker and file any change in the terms of the PPM directly with SEBI, with an undertaking in the format of Annexure 17 signed and stamped by the CEO of the manager (or the person in an equivalent role) and its compliance officer.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Reporting to SEBI
- Frequency
- Annual
- Timeline
- with the annual intimation of changes in the PPM
- Format
- Annexure 15 (due diligence certificate); Annexure 17 (undertaking) for the funds that file directly
- XBRL
- No
- Penalty
- None stated
What it requires
- File the intimation of changes in the PPM with SEBI through an unassociated merchant banker with its due diligence certificate, or directly where the text allows
When it applies
- Unless Changes in the terms listed in Annexure 16 may be filed directly with SEBI
What it does not reach
- Unless Exempt funds file directly, with the undertaking of Annexure 17 signed and stamped by the CEO and the compliance officer of the manager
From the provisions
In Chapter 21 — Periodic reporting requirements for AIFs
Whom else it names
- Supervised by Securities and Exchange Board of India
History
- Made — until 30 July 2026 The intimation to SEBI of changes in the terms of the PPM must be filed through a merchant banker -- one that is not an associate of the AIF, its sponsor, manager or trustee -- with the merchant banker's due diligence certificate in the format of Annexure 15; changes in the terms of the PPM listed in Annexure 16 may instead be filed directly with SEBI. Large value funds are exempt from intimating changes through a merchant banker and may file any change in the terms of the PPM directly with SEBI, with an undertaking in the format of Annexure 17 signed and stamped by the CEO of the manager (or the person in an equivalent role) and its compliance officer.
- Exemption changed by the ‘Green-Channel: AIF Rollout Upon Document Acknowledgement’ (GARUDA) Mechanism for Processing of Placement Memorandum of Alternative Investment Funds (AIFs) filed with SEBI
Can a machine check it?
Computable (set-membership). The route of filing, the kind of fund, the merchant banker's association and the documents filed are recorded facts.
Its check
| Field | Type | What it is |
|---|---|---|
filed_through | string | merchant-banker or direct |
fund_type | string | lvf, ai-only, angel, or another kind of fund |
all_changes_in_annexure_16 (optional) | bool | |
merchant_banker_is_associate (optional) | bool | |
due_diligence_certificate_filed (optional) | bool | |
ceo_compliance_officer_undertaking (optional) | bool |
The limits in force today
- direct filing fund types ai-only, lvf, angel
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-aifmc-21-4-2-ppm-changes-filing-route
Annexure 20 — Applicability of chapters and provisions of the Master circular for AIFs to Migrated VCFs1
A Migrated VCF need not use the master circular's PPM template or make its disclosures of the distribution waterfall and disciplinary history, but the disclosures in its placement memorandum must be in line with Regulation 19AC of the AIF Regulations; the disclosure of the Investor Charter and of investor complaints in the PPM does apply to it.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- Regulation 19AC of the AIF Regulations
- XBRL
- No
- Penalty
- None stated
What it requires
- Make the disclosures in the placement memorandum in line with Regulation 19AC of the AIF Regulations
When it applies
- Also The fund is a Migrated VCF issuing or keeping a placement memorandum
What it does not reach
- Unless The SEBI template for the PPM, and the disclosure of the distribution waterfall and disciplinary history in it, do not apply to a Migrated VCF
From the provisions
In Annexure 20 — Applicability of chapters and provisions of the Master circular for AIFs to Migrated VCFs
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Whether the placement memorandum's disclosures are in line with Regulation 19AC is a reading of the document.
Not yet reviewed · extracted by a model from the text · ob-aifmc-anx20-migrated-vcf-ppm-per-reg-19ac
Mutual Funds Master Circular, 202683
Chapter 1 — OFFER DOCUMENT FOR SCHEMES22
The mutual fund (through its AMC) must prepare its offer document in two parts, a Scheme Information Document and a Statement of Additional Information, in Formats 5A and 5B, and file them with the Board in terms of the Regulations.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- XBRL
- No
- Penalty
- None stated
What it requires
- Prepare the SID and the SAI in Formats 5A and 5B and file them with the Board
When it applies
- When when a scheme is to be offered
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Conformity of the documents to the formats is a reading of their contents, not a data test.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-prepare-file-sid-sai
The board of the AMC and the trustees must exercise due diligence to ensure that the SID, the SAI and the fees paid conform to the Mutual Funds Regulations.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Exercise due diligence that the SID, SAI and fees conform to the Regulations
When it applies
- When on the preparation and filing of an SID or SAI
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (conduct). Due diligence is a judgement of the boards' conduct.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sid-sai-due-diligence
A draft SID on which the Board has issued observations must be made available on SEBI's website for at least 8 working days for public comments on the adequacy of its disclosures.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Others / Misc.
- Frequency
- On an event
- Timeline
- draft SID on SEBI's website for at least 8 working days
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Keep the draft SID on SEBI's website for public comments for at least 8 working days
When it applies
- When the Board has issued observations on the draft SID
- Within at least 8 working days on SEBI's website
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (deadline). The display is SEBI's own act; the eight working days are tested where they bind the AMC, in ob-mfmc-offer-launch-after-public-comments.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sebi-host-draft-sid
After the draft SID has been on SEBI's website for public comments for at least 8 working days, the AMC may launch the scheme, once it has filed the final SID and KIM under para 1.1.2(c).
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- after at least 8 working days of public comments, and after filing the final SID and KIM
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch the scheme only after the 8-working-day comment period and the filing of the final SID and KIM
When it applies
- Within at least 8 working days of public comment before launch
- When the final SID and KIM have been filed under para 1.1.2(c)
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). The working days between the draft's posting and the launch are counted Monday to Friday; a weekday-holiday count makes it exact, and without it a borderline count goes to a person.
Its check
| Field | Type | What it is |
|---|---|---|
draft_posted_on | date | SEBI website |
launch_on | date | scheme launch record |
final_sid_kim_filed | bool | the final SID and KIM have been filed under para 1.1.2(c) |
weekday_holidays (optional) | int | holidays falling on weekdays within the window; makes the working-day count exact |
The limits in force today
- min comment working days 8 working_days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-launch-after-public-comments
The AMC must submit a soft copy of the draft SID to the Board in HTML or PDF format, with an undertaking certifying that the information in the soft copy is correct and accurate.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- soft copy of the draft SID in HTML or PDF format, with an undertaking of its correctness
- XBRL
- No
- Penalty
- None stated
What it requires
- Submit the draft SID as an HTML or PDF soft copy with an undertaking of its correctness
When it applies
- When on filing a draft SID
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (disclosure-present). The format is one of a closed list and the undertaking is present or not.
Its check
| Field | Type | What it is |
|---|---|---|
soft_copy_format | string | |
undertaking_submitted | bool |
The limits in force today
- permitted soft copy formats HTML,PDF
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-draft-sid-soft-copy
A single SAI common to all schemes must be filed with the Board, separately or with the first draft SID; the AMC must file its soft copy in PDF after incorporating the Board's comments, upload it on its own and AMFI's websites, and make a printed copy available to an investor on request.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- SAI filed separately or with the first draft SID
- Format
- soft copy of the SAI in PDF format
- XBRL
- No
- Penalty
- None stated
What it requires
- File a single SAI with the Board and its PDF soft copy after the Board's comments
- Upload the SAI on the AMC's and AMFI's websites
- Give an investor a printed copy of the SAI on request
When it applies
- When separately or with the first draft SID
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Partly computable (disclosure-present). The count, the format and the uploads are data; giving printed copies on request is not.
Its check
| Field | Type | What it is |
|---|---|---|
sai_count | int | number of SAIs the mutual fund has on file |
soft_copy_format | string | |
uploaded_on_amc_website | bool | |
uploaded_on_amfi_website | bool | |
printed_copy_on_request_confirmed (optional) | bool | a person's confirmation that printed copies are given on request |
The limits in force today
- sais per mutual fund 1
- sai soft copy format PDF
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sai-file-and-publish
The SAI must be updated within 3 months from the end of each financial year and filed with SEBI.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Annual
- Timeline
- within 3 months from the end of the financial year
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Update the SAI and file it with SEBI
When it applies
- Within within 3 months from the end of the financial year
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). A date against the financial year's end plus three months.
Its check
| Field | Type | What it is |
|---|---|---|
financial_year_end | date | |
sai_updated_and_filed_on | date |
The limits in force today
- update window months 3 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sai-annual-update
Any material change in the SAI must be updated on the mutual fund's and AMFI's websites, SEBI must be told of the changes within 7 calendar days, and the updated SAI must state the date the changes take effect.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- SEBI intimated within 7 calendar days of the change
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Update a material change in the SAI on the MF and AMFI websites
- Intimate SEBI of the changes
- State the changes' effective date in the updated SAI
When it applies
- When a change is made in the SAI
- Within within 7 calendar days of the change
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Partly computable (deadline). The seven days and the stated effective date are data; whether a change is material, and so had to go on the websites, is a judgement.
Its check
| Field | Type | What it is |
|---|---|---|
sai_changed_on | date | |
sebi_intimated_on | date | |
effective_date_stated | bool | |
websites_updated_confirmed (optional) | bool | a person's confirmation that a material change is on the MF and AMFI websites |
The limits in force today
- intimation window days 7 days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sai-change-intimation
The AMC must submit the final SID (with the Board's comments incorporated) and the KIM at least 2 working days before the scheme's launch, only by e-mail to imdsidfiling@sebi.gov.in, with an undertaking that the soft copy is correct and accurate, and upload the soft copy on AMFI's website 2 working days before the launch.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- at least 2 working days prior to the launch of the scheme (SEBI and AMFI website)
- Format
- soft copy by e-mail only to imdsidfiling@sebi.gov.in, with an undertaking of its correctness
- XBRL
- No
- Penalty
- Specified — Para 1.1.2(c)(i); Para 1.1.2(c)(ii)
What it requires
- E-mail the final SID and KIM to SEBI's dedicated address with an undertaking
- Upload the soft copy on AMFI's website
When it applies
- Within at least 2 working days before the launch
If it is not met
- Failure to submit the final SID with the Board before it is issued for circulation shall invite penalties under the Regulations.
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). Working days before launch counted Monday to Friday, exact with a weekday-holiday count; the channel and the undertaking are flags.
Its check
| Field | Type | What it is |
|---|---|---|
final_sid_kim_filed_on | date | |
amfi_uploaded_on | date | |
launch_on | date | |
filed_by_email_to_dedicated_id | bool | |
undertaking_submitted | bool | |
weekday_holidays (optional) | int | holidays falling on weekdays within the window; makes the working-day count exact |
The limits in force today
- min working days before launch 2 working_days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-final-sid-kim-filing
The SID of an open-ended or interval scheme must be updated first within six months from the end of the half-year in which the scheme was launched (on data as at the end of the previous month) and after that within two months from the end of each half-year (on data as at the end of September or March), and the updated soft copy filed with SEBI by e-mail to imdsidfiling@sebi.gov.in and the dealing officer within 7 calendar days.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Half-yearly
- Timeline
- first update within six months from the end of the half-year of launch; later updates within 2 months from the end of each half-year; soft copy filed with SEBI within 7 calendar days
- Format
- soft copy filed digitally by e-mail to imdsidfiling@sebi.gov.in and the dealing officer
- XBRL
- No
- Penalty
- None stated
What it requires
- Update the SID on the stage's timetable and data date
- File the updated SID's soft copy with SEBI by e-mail
When it applies
- Within initial update within six months from the end of the launch half-year
- Within subsequent updates within two months from the end of each half-year
- Within soft copy filed within 7 calendar days
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). Dates against the half-year's end, the data's reference date and a seven-day filing window.
Its check
| Field | Type | What it is |
|---|---|---|
stage | string | initial or subsequent |
half_year_end | date | 31 March or 30 September |
sid_updated_on | date | |
reference_date | date | the date the update's data are as at |
sebi_filed_on | date |
The limits in force today
- initial update window months 6 months
- subsequent update window months 2 months
- sebi filing window days 7 days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sid-half-yearly-update
On any other change to an open-ended or interval scheme, the AMC must immediately issue an addendum and display it on its website; the latest addendum forms part of the SID and KIM (for example the current load structure is attached to every KIM and SID until updated) and account statements keep showing the applicable load; digital SIDs must link to every addendum issued since the last update; and the addendum must be e-mailed to all distributors, brokers and Investor Service Centres.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- addendum issued and displayed immediately
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Issue and display the addendum on the AMC website immediately, attach it to the SID and KIM, and keep the load in account statements
- Link every addendum from the digital SID
- E-mail the addendum to distributors, brokers and ISCs
When it applies
- When a change other than in fundamental attributes
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Presence and currency of addenda across documents and channels, with no number to test.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-other-change-addendum
The AMC must file its replies to the modifications the Board suggests on a SID under Regulation 25(2) within six months of the Board's letter; if the six months lapse, it must refile the SID with the filing fees.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within six months from the date of the Board's letter
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Reply to the Board's suggested modifications
- On lapse, refile the SID with the filing fees
When it applies
- Within within six months from the date of the Board's letter
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). A six-month window, and a refiling flag after it.
Its check
| Field | Type | What it is |
|---|---|---|
board_letter_on | date | |
reply_filed_on (optional) | date | |
refiled_with_fees (optional) | bool |
The limits in force today
- reply window months 6 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-reply-observations-6m
A scheme may be launched within six months from the Board's final observations; an AMC that intends to launch it later must refile the SID with the filing fees.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within six months from the date of issuance of final observations by the Board
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch within six months of the final observations, or refile the SID with the fees
When it applies
- Within within six months from the issue of the final observations
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). A six-month window and a refiling flag.
Its check
| Field | Type | What it is |
|---|---|---|
final_observations_on | date | |
launch_on | date | |
refiled_with_fees (optional) | bool |
The limits in force today
- launch window months 6 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-launch-within-6m-or-refile
AMCs must follow the format of Standard Observations in Formats 6A and 6B and, when filing the SID and SAI, state the page on which each standard observation has been incorporated.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- XBRL
- No
- Penalty
- None stated
What it requires
- Follow Formats 6A/6B and cite the page of each standard observation in the SID and SAI
When it applies
- When on filing an SID or SAI
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Whether each observation is incorporated and cited is read from the documents.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-standard-observations
Every application form for a mutual fund scheme must be accompanied by the KIM, in terms of Regulation 26 and Format No. 5C, printed in not less than 7-point type with proper spacing.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- Ongoing
- Timeline
- The text sets none
- XBRL
- No
- Penalty
- None stated
What it requires
- Attach the KIM, in Format 5C and at least 7-point type, to every application form
When it applies
- Threshold KIM type size at least 7 point
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Partly computable (disclosure-present). The KIM's presence and type size are data; its format and spacing are a reading.
Its check
| Field | Type | What it is |
|---|---|---|
kim_accompanies_form | bool | |
kim_font_size_pt | decimal | |
format_and_spacing_confirmed (optional) | bool | a person's confirmation of Format 5C and proper spacing |
The limits in force today
- min font size pt 7 pt
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-kim-with-application
The KIM must be updated within two months from the end of each half-year, on data as at the end of September and March, and filed with the Board forthwith, electronically only.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Half-yearly
- Timeline
- within two months from the end of each half-year; filed with the Board forthwith
- Format
- filed with the Board through electronic mode only
- XBRL
- No
- Penalty
- None stated
What it requires
- Update the KIM on half-year-end data
- File the updated KIM with the Board electronically, forthwith
When it applies
- Within within two months from the end of each half-year
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Partly computable (deadline). The two months and the data date are data; 'forthwith' sets no number.
Its check
| Field | Type | What it is |
|---|---|---|
half_year_end | date | |
kim_updated_on | date | |
reference_date | date | |
filed_electronically | bool | |
filed_forthwith_confirmed (optional) | bool | a person's confirmation that the filing was forthwith |
The limits in force today
- update window months 2 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-kim-half-yearly-update
The trustees and the AMC must ensure that the SID and SAI are readily available on the mutual fund's website, and confirm this to the Board in the half-yearly trustee report.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Ongoing
- Timeline
- availability confirmed in each half-yearly trustee report
- XBRL
- No
- Penalty
- None stated
What it requires
- Keep the SID and SAI readily available on the mutual fund's website
- Confirm the availability to the Board in the half-yearly trustee report
When it applies
- Within confirmed in each half-yearly trustee report
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Ready availability on a website and a confirmation inside a report are not numeric tests.
Not yet reviewed · extracted by a model from the text · ob-mfmc-offer-sid-sai-on-website
The NFO of an open-ended or close-ended scheme, other than an ELSS, must be open for subscription for at least 3 working days and not more than 15 calendar days; an ELSS's NFO period follows the Government of India's guidelines.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- NFO open for at least 3 working days and not more than 15 calendar days
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Keep the NFO open for 3 working days to 15 calendar days
When it applies
- Threshold at least 3 working days
- Threshold not more than 15 calendar days
What it does not reach
- Unless an ELSS's NFO period is governed by the Government of India's guidelines
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). Days counted between two dates; weekday holidays make the working-day count exact.
Its check
| Field | Type | What it is |
|---|---|---|
scheme_is_elss | bool | |
nfo_opened_on | date | |
nfo_closed_on | date | |
weekday_holidays (optional) | int | holidays falling on weekdays within the window; makes the working-day count exact |
The limits in force today
- min working days 3 working_days
- max calendar days 15 days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-period
Before the NFO closes, the mutual fund or AMC may deploy the NFO proceeds in triparty repo on Government securities or treasury bills.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- before the closure of the NFO period
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Deploy NFO proceeds only in triparty repo on G-secs or T-bills during the NFO
When it applies
- Within before the closure of the NFO period
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (set membership). The deployment is one of a closed list of instruments.
Its check
| Field | Type | What it is |
|---|---|---|
nfo_deployments | string | comma-separated codes: trepo-gsec, trepo-tbill, or any other |
The limits in force today
- permitted nfo deployments trepo-gsec,trepo-tbill
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-deploy-proceeds-trepo
The appreciation earned on NFO proceeds deployed during the NFO must be passed on to investors; where the scheme does not raise its minimum subscription, the interest earned must be returned to investors, in proportion to their investments, with the refund of the subscription.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Pass the deployment's appreciation to investors
- On failure to raise the minimum subscription, return the interest pro rata with the refund
When it applies
- When NFO proceeds were deployed during the NFO
- When the minimum subscription is not raised (for the return of interest with the refund)
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Partly computable (arithmetic-cap). The totals are data; the proportionate split among investors needs a person's confirmation.
Its check
| Field | Type | What it is |
|---|---|---|
returns_earned_inr | decimal | |
returns_passed_to_investors_inr | decimal | |
proportional_allocation_confirmed (optional) | bool | a person's confirmation that each investor got a proportionate share |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-pass-on-deployment-returns
The mutual fund must allot units or refund money, and dispatch statements of account, within 5 working days from the close of the NFO.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within 5 working days from the closure of the NFO
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 15.1.4
What it requires
- Allot units or refund money and dispatch statements of account
When it applies
- Within within 5 working days from the closure of the NFO
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). Working days after the NFO's close, counted Monday to Friday; a weekday-holiday count decides borderline cases.
Its check
| Field | Type | What it is |
|---|---|---|
nfo_closed_on | date | |
allotted_or_refunded_on | date | |
statements_dispatched_on | date | |
weekday_holidays (optional) | int | holidays falling on weekdays within the window; makes the working-day count exact |
The limits in force today
- max working days 5 working_days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-allotment-refund-5wd
Every scheme except an ELSS must be open for ongoing repurchase, sale or trading within 5 working days of allotment.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within 5 working days of allotment
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Open the scheme for ongoing repurchase, sale or trading
When it applies
- Within within 5 working days of allotment
What it does not reach
- Unless ELSS schemes
From the provisions
In Chapter 1 — OFFER DOCUMENT FOR SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). Working days after allotment, counted Monday to Friday; a weekday-holiday count decides borderline cases.
Its check
| Field | Type | What it is |
|---|---|---|
scheme_is_elss | bool | |
allotted_on | date | |
reopened_on | date | |
weekday_holidays (optional) | int | holidays falling on weekdays within the window; makes the working-day count exact |
The limits in force today
- max working days 5 working_days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-reopen-for-transactions-5wd
Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES9
Mutual funds and AMCs must provide, in existing and new schemes, a separate plan for direct investments not routed through a distributor, with a separate NAV and a lower expense ratio, since no distribution commission is paid under it.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Offer a direct plan with its own NAV and a lower expense ratio
When it applies
- Threshold direct plan's expense ratio lower than the regular plan's
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (arithmetic-cap). Flags and a comparison of two expense ratios.
Its check
| Field | Type | What it is |
|---|---|---|
direct_plan_offered | bool | |
direct_plan_separate_nav | bool | |
direct_plan_expense_ratio_pct | decimal | |
regular_plan_expense_ratio_pct | decimal |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-plan-direct-plan
An additional plan under an existing open-ended scheme that differs substantially from the scheme in portfolio or other characteristics must be launched as a separate scheme under the regulatory provisions.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch a substantially different plan as a separate scheme
When it applies
- When an additional plan that differs substantially in portfolio or other characteristics
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (conduct). Whether a plan differs substantially is a judgement.
Not yet reviewed · extracted by a model from the text · ob-mfmc-plan-different-plan-as-new-scheme
A plan consistent with an existing open-ended scheme's characteristics may be launched as an additional plan by an addendum; the proposal must be approved by the boards of the AMC and the trustees, and the addendum, stating the salient features (loads, expenses and anything else the AMC or trustees think material), filed with the Board 21 calendar days before the plan opens.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- addendum filed with the Board 21 calendar days in advance of the opening of the plan
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Approve the additional plan
- File the addendum with the Board 21 calendar days before the plan opens
When it applies
- Within 21 calendar days in advance of the plan's opening
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Partly computable (deadline). The approvals and the 21 days are data; the plan's consistency and the addendum's material contents are judgements.
Its check
| Field | Type | What it is |
|---|---|---|
amc_board_approved | bool | |
trustees_approved | bool | |
addendum_filed_on | date | |
plan_opens_on | date | |
consistency_and_contents_confirmed (optional) | bool |
The limits in force today
- min advance filing days 21 days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-plan-additional-plan-addendum
The AMC must publish an advertisement or issue a press release at the time it launches an additional plan.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- at the time of launch of the additional plan
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Publish an advertisement or issue a press release at the launch
When it applies
- When the launch of an additional plan
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). 'At the time of launch' sets no window to measure.
Not yet reviewed · extracted by a model from the text · ob-mfmc-plan-additional-plan-advertisement
Mutual funds must launch sectoral or thematic funds only in the sectors and themes on the list AMFI publishes, and updates half-yearly, in consultation with the Board.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch sectoral or thematic funds only on AMFI's list of sectors and themes
When it applies
- When the launch of a sectoral or thematic fund
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
History
- Made
Can a machine check it?
Computable (set membership). The fund's sector or theme against AMFI's published list.
Its check
| Field | Type | What it is |
|---|---|---|
fund_sector_or_theme | string | |
amfi_sectors_and_themes | string | comma-separated list as AMFI publishes it |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-cat-sectoral-theme-amfi-list
The SID of a debt scheme must explain the concept of Macaulay duration, stated at portfolio level, and the SID of a Medium Term or Medium to Long Term Fund must state its asset allocation under an anticipated adverse situation.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Explain Macaulay duration (portfolio level) in the SID, and the adverse-situation allocation for medium funds
When it applies
- When the SID of a debt scheme
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Contents of the SID.
Not yet reviewed · extracted by a model from the text · ob-mfmc-cat-debt-sid-disclosures
An AMC may offer a sectoral debt scheme only after ensuring that there is sufficient investment-grade paper available in the market for the sector.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- On an event
- Timeline
- before the scheme is offered
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Ensure sufficient investment-grade paper in the sector before offering the scheme
When it applies
- When a sectoral debt scheme is to be offered
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (conduct). 'Sufficient availability' is a judgement.
Not yet reviewed · extracted by a model from the text · ob-mfmc-cat-sectoral-debt-paper-availability
ProhibitionA mutual fund may have only one scheme in each category, except index funds and ETFs replicating or tracking different indices, funds of funds with different underlying schemes, and sectoral or thematic funds investing in different sectors or themes.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Have no more than one scheme per category, save the listed exceptions
When it applies
- Threshold one scheme per category
What it does not reach
- Unless index funds/ETFs on different indices; FoFs with different underlying schemes; sectoral/thematic funds in different sectors or themes
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (arithmetic-cap). A count per category, or distinct keys for the excepted categories.
Its check
| Field | Type | What it is |
|---|---|---|
scheme_category | string | |
schemes_in_category | string | comma-separated: each scheme's index, underlying, sector or theme (or name) |
The limits in force today
- max schemes per category 1
- categories allowing several index-fund,etf,fof,sectoral,thematic
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-cat-one-scheme-per-category
A mutual fund may launch either an active ELSS (item 13 of the equity table) or a passive ELSS through an index fund (item 1 of the other schemes table), subject to the Equity Linked Saving Scheme, 2005; a passive ELSS must be based on an index of equity shares from the top 250 companies by market capitalisation.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Offer one open-ended ELSS, active or passive, a passive one on a top-250 index
When it applies
- Threshold either an active or a passive ELSS
- Threshold passive ELSS index drawn from the top 250 companies
From the provisions
In Chapter 3 — CONVERSION & CONSOLIDATION OF SCHEMES, TYPES OF MUTUAL FUND PLANS AND CATEGORIZATION & RATIONALIZATION OF MUTUAL FUND SCHEMES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (arithmetic-cap). A count of ELSS schemes and the index's lowest rank.
Its check
| Field | Type | What it is |
|---|---|---|
open_ended_elss_schemes | int | |
elss_kind | string | active or passive |
index_universe_lowest_rank (optional) | int |
The limits in force today
- max elss schemes 1
- passive elss max rank 250 rank
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-cat-elss-active-or-passive
Chapter 4 — NEW PRODUCTS12
The SID of a Gold or Silver ETF must disclose, among other things, the tracking error and tracking difference, the market risk from volatile gold or silver prices, the liquidity risks in physical or derivative markets, the risks of handling, storing and safekeeping the metal, the applicable tax provisions, and the creation unit size.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose the listed risks, the tax provisions and the creation unit size in the ETF's SID
When it applies
- When in the SID of every Gold or Silver ETF
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Whether the SID discloses each item is a reading of the document.
Not yet reviewed · extracted by a model from the text · ob-mfmc-gold-silver-etf-sid-disclosures
The units of Gold and Silver ETFs must be listed on recognised stock exchanges.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- One-time
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- List the ETF's units on a recognised stock exchange
When it applies
- When for every Gold or Silver ETF
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (set membership). Whether the units are listed on a recognised exchange is a recorded status.
Its check
| Field | Type | What it is |
|---|---|---|
listed_on_recognised_exchange | bool | the units are listed on at least one recognised stock exchange |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-gold-silver-etf-exchange-listing
Debt ETFs and index funds may be based only on corporate debt indices, G-sec indices (government securities, T-bills and/or SDLs) or hybrid debt indices, and AMCs must launch them only on the debt indices in the list AMFI has issued.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Base each debt ETF or index fund on a permitted type of debt index that is on AMFI's list
When it applies
- When on launching a debt ETF or index fund
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (set membership). The index's type and its presence on AMFI's list are recorded facts; the test is membership of a closed list.
Its check
| Field | Type | What it is |
|---|---|---|
index_type | string | corporate_debt, gsec or hybrid_debt |
index_on_amfi_list | bool | the index is in AMFI's list of debt indices |
The limits in force today
- permitted index types corporate_debt,gsec,hybrid_debt
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-debt-passive-permitted-index
AMCs may launch hybrid passive funds, a class of ETF or index fund replicating a composite index of equity and debt, so that investors can hold equity and debt in a single product.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch a hybrid ETF or index fund
When it applies
- Also subject to Paragraph 4.5.8(c)-(h)
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (permission). A liberty to launch a class of scheme; its limits are checked under ob-mfmc-hybrid-passive-categories and ob-mfmc-hybrid-passive-asset-allocation.
Not yet reviewed · extracted by a model from the text · ob-mfmc-hybrid-passive-fund-launch
AMCs may launch hybrid passive schemes only as Balanced, Equity Oriented or Debt Oriented schemes, and at most one ETF and one index fund in each of those categories.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch hybrid passive schemes only in the three categories, one ETF and one index fund per category
When it applies
- When on launching a hybrid ETF or index fund
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (set membership). The scheme's category, its vehicle and the AMC's count in that category are recorded facts.
Its check
| Field | Type | What it is |
|---|---|---|
category | string | balanced, equity_oriented or debt_oriented |
vehicle | string | etf or index_fund |
schemes_in_category_and_vehicle | int | the AMC's hybrid passive schemes of this category and vehicle, the new one included |
The limits in force today
- categories balanced,equity_oriented,debt_oriented
- max per category and vehicle 1
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-hybrid-passive-categories
The minimum subscription amount at the New Fund Offer of a hybrid ETF or index fund is Rs. 10 crore.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Raise at least Rs. 10 crore at the NFO of a hybrid ETF or index fund
When it applies
- Threshold NFO subscription >= Rs. 10 crore
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (numeric floor). The amount subscribed at the NFO is a recorded figure.
Its check
| Field | Type | What it is |
|---|---|---|
nfo_subscription_inr_crore | decimal | amount subscribed at the NFO |
The limits in force today
- min nfo subscription inr crore 10 INR crore
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-hybrid-passive-nfo-minimum
AMCs may launch close-ended debt passive schemes whether the mutual fund is registered under the MF Regulations or under the MF Lite framework.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch close-ended debt passive schemes
When it applies
- Also whether registered under the MF Regulations or the MF Lite framework
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (permission). A liberty to launch; the conditions on such schemes are checked under ob-mfmc-close-ended-debt-passive-target-maturity.
Not yet reviewed · extracted by a model from the text · ob-mfmc-close-ended-debt-passive-launch
Every scheme in the ESG sub-category of thematic equity schemes must be launched with one of six strategies: exclusion; integration; best-in-class and positive screening; impact investing; sustainable objectives; or transition and transition related investments.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Launch each ESG scheme with one of the six strategies
When it applies
- When on launching a scheme in the ESG sub-category
From the provisions
- Para 4.6.1(a)
- Para 4.6.1(a)(i)
- Para 4.6.1(a)(ii)
- Para 4.6.1(a)(iii)
- Para 4.6.1(a)(iv)
- Para 4.6.1(a)(v)
- Para 4.6.1(a)(vi)
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (set membership). The strategy a scheme is launched with is recorded in its SID; the test is membership of a closed list.
Its check
| Field | Type | What it is |
|---|---|---|
strategy | string | the strategy stated in the SID |
The limits in force today
- permitted strategies exclusion,integration,best_in_class_positive_screening,impact_investing,sustainable_objectives,transition
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-esg-scheme-strategy
AMCs must ensure that the ESG schemes launched by the mutual fund are clearly distinct from one another in asset allocation, investment strategy and the like.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Operations
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Keep the fund's ESG schemes clearly distinct
When it applies
- When where the mutual fund has more than one ESG scheme
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (conduct). 'Clearly distinct' is a comparison of schemes' features that the text does not quantify.
Not yet reviewed · extracted by a model from the text · ob-mfmc-esg-schemes-distinct
A mutual fund may offer an Infrastructure Debt Fund by private placement to fewer than 50 investors instead of a New Fund Offer to the public; all the other conditions for IDFs offered through an NFO, such as the kinds of investment and the investment restrictions, still apply.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Offer an IDF by private placement to fewer than 50 investors
When it applies
- Threshold fewer than 50 investors
From the provisions
In Chapter 4 — NEW PRODUCTS
History
- Made
Can a machine check it?
Computable (holding threshold). The number of investors placed with is a recorded figure; the test is 'less than 50'.
Its check
| Field | Type | What it is |
|---|---|---|
investors_count | int | investors to whom the units are placed |
The limits in force today
- max investors exclusive 50 investors
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-idf-private-placement
A mutual fund offering an Infrastructure Debt Fund by private placement must file a Placement Memorandum with SEBI, in the prescribed format, in place of a Scheme Information Document and a Key Information Memorandum.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- Placement Memorandum in the prescribed format (Regulation 49-OA of the SEBI (Mutual Funds) Regulations, 1996; not in this text)
- XBRL
- No
- Penalty
- None stated
What it requires
- File a Placement Memorandum in the prescribed format with SEBI
When it applies
- When an IDF offered by private placement
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Conformity to the prescribed format is a reading of the document.
Not yet reviewed · extracted by a model from the text · ob-mfmc-idf-placement-memorandum-filing
AMCs must upload the Placement Memorandum of an Infrastructure Debt Fund on their websites after the allotment of units, and on the website of the recognised stock exchange where the scheme is to be listed at the time of listing.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- AMC website after allotment of units; stock exchange website at the time of listing
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Upload the Placement Memorandum on the AMC's website after allotment
- Have it uploaded on the listing exchange's website at the time of listing
When it applies
- When allotment of IDF units; listing of the scheme
From the provisions
In Chapter 4 — NEW PRODUCTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). The text sets no time limit; 'after allotment' fixes only the order of events.
Not yet reviewed · extracted by a model from the text · ob-mfmc-idf-placement-memorandum-upload
Chapter 6 — DISCLOSURES & REPORTING NORMS2
The SID and KIM of every scheme the AMC manages, and the SAI, must be made available on the mutual fund's/AMC's website.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Continuous Disclosures
- Frequency
- Ongoing
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Make each scheme's SID and KIM, and the SAI, available on the website
From the provisions
In Chapter 6 — DISCLOSURES & REPORTING NORMS
Whom else it names
- For the benefit of Investor
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Whether the documents or website content exist and say what the paragraph requires is verified by inspecting them; the paragraph sets no figure or date to compute.
Not yet reviewed · extracted by a model from the text · ob-mfmc-disc-sid-kim-sai-on-website
Each mutual fund must submit to SEBI the New Scheme Report, complete in all respects as per Format No. 3A, within 10 working days of the date of allotment, confirming compliance with Regulation 24(4) while filing it.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within 10 working days from the date of allotment
- XBRL
- No
- Penalty
- None stated
What it requires
- Submit the NSR (Format No. 3A) to SEBI
- Confirm compliance with Regulation 24(4) while filing the NSR
When it applies
- When units of a new scheme are allotted
- Within within 10 working days from the date of allotment
From the provisions
In Chapter 6 — DISCLOSURES & REPORTING NORMS
Whom else it names
- For the benefit of Unitholder
- Supervised by SEBI
History
- Made
Can a machine check it?
Computable (deadline). The allotment and submission dates, the holidays and the confirmation are data; the working-day count is arithmetic. 'Complete in all respects' is read from the filing.
Its check
| Field | Type | What it is |
|---|---|---|
allotment_date | date | |
submitted_on | date | |
regulation_24_4_confirmed | bool | |
holidays (optional) | list<date> |
The limits in force today
- window working days 10 working days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-rpt-nsr-10wd
Chapter 7 — GOVERNANCE NORMS16
If an open-ended scheme breaches either condition during its NFO, it must meet both within three months or by the end of the succeeding calendar quarter from the close of the NFO, whichever is earlier; a scheme or plan still without 20 investors then is wound up under Regulation 36(2)(c) automatically, and its units are redeemed at the applicable NAV.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within three months or the end of the succeeding calendar quarter from the close of the NFO, whichever is earlier
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 7.19.1(c)
What it requires
- Bring the scheme within both conditions within the cure period
When it applies
- When either condition is breached during the NFO
- Within within three months or the end of the succeeding calendar quarter from the close of the NFO, whichever is earlier
If it is not met
- If the scheme or plan does not have a minimum of 20 investors in the stipulated period, Regulation 36(2)(c) applies automatically without any reference from SEBI: the scheme or plan is wound up and its units are redeemed at the applicable NAV.
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). The close of the NFO and the date the conditions were met are data.
Its check
| Field | Type | What it is |
|---|---|---|
breached_during_nfo | bool | |
nfo_close_date | date | |
conditions_met_on | date |
The limits in force today
- cure months 3 months
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-min-investors-open-ended-nfo-cure
A close-ended or interval scheme, and each plan under it, must have at least 20 investors immediately after the close of the NFO, at allotment (and an interval scheme at the end of each specified transaction period); if it does not, it is wound up under Regulation 36(2)(c) automatically without any reference from SEBI.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- immediately after the close of the NFO, at allotment (interval schemes also at the end of each specified transaction period)
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 7.19.2(c)
What it requires
- Have at least 20 investors in each scheme and plan at allotment
When it applies
- Threshold at least 20 investors
- Within immediately after the close of the NFO, at allotment; for an interval scheme also at the end of each specified transaction period
- Also applied at the portfolio level (para 7.19.4(a))
What it does not reach
- Unless not applicable to ETFs (para 7.19.4(b))
If it is not met
- In case of non-fulfilment of the condition of minimum 20 investors, the scheme or plan is wound up in accordance with Regulation 36(2)(c) automatically without any reference from SEBI.
From the provisions
- Para 7.19.2
- Para 7.19.2(a)
- Para 7.19.2(a)(i)
- Para 7.19.2(b)
- Para 7.19.2(c)
- Para 7.19.2(e)
- Para 7.19.4
- Para 7.19.4(a)
- Para 7.19.4(b)
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (threshold). The number of investors at allotment is data.
Its check
| Field | Type | What it is |
|---|---|---|
is_etf (optional) | bool | |
investors_at_allotment | int | at allotment, or at the end of an interval scheme's specified transaction period |
The limits in force today
- min investors 20 investors
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-min-investors-close-ended-20
No single investor may account for more than 25% of the corpus of a close-ended or interval scheme or plan at allotment: an application beyond 25% is liable to be rejected to the extent of the excess, the allotment is effective only up to 25% of the corpus collected, and the excess must be refunded within 6 weeks of the close of the NFO.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- excess refunded within 6 weeks of the date of closure of the NFO
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Limit each investor's allotment to 25% of the corpus collected
- Refund the excess exposure
When it applies
- Threshold no single investor above 25% of the corpus at allotment
- Within refund within 6 weeks of the close of the NFO
What it does not reach
- Unless not applicable to ETFs (para 7.19.4(b))
From the provisions
In Chapter 7 — GOVERNANCE NORMS
History
- Made
Can a machine check it?
Computable (threshold). The share allotted and the refund date are data; 6 weeks is 42 calendar days.
Its check
| Field | Type | What it is |
|---|---|---|
is_etf (optional) | bool | |
largest_investor_allotted_pct | decimal | |
excess_application_received | bool | an investor applied for more than 25% of the corpus |
nfo_close_date (optional) | date | |
excess_refunded_on (optional) | date |
The limits in force today
- max single investor pct 25 %
- refund window days 42 calendar days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-min-investors-close-ended-25pct-refund
The requisite disclosure of the minimum-investor and single-investor conditions for close-ended and interval schemes must be made in the SID.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose the conditions in the SID
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). "Requisite disclosure" is a document check with no prescribed wording.
Not yet reviewed · extracted by a model from the text · ob-mfmc-min-investors-sid-disclosure
At the NFO a scheme must collect at least the minimum subscription for its category: ₹20 crore for debt and debt-oriented hybrid schemes, ₹10 crore for debt ETFs and index funds, ₹5 crore for other ETFs and index funds, and ₹10 crore for all other schemes.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- at the time of the NFO
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Collect at least the category's minimum subscription at the NFO
When it applies
- Threshold minimum subscription at NFO by category: ₹20 crore (debt, debt-oriented hybrid), ₹10 crore (debt ETFs, index funds), ₹5 crore (other ETFs, index funds), ₹10 crore (all others)
What it does not reach
- Unless an ETF for which the AMC contributes the initial fund for unit creation instead of launching an NFO (para 7.20.5)
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (threshold). The category and the amount collected are data.
Its check
| Field | Type | What it is |
|---|---|---|
etf_seeded_by_amc_without_nfo (optional) | bool | |
scheme_category | string | debt_or_debt_oriented_hybrid, debt_etf_or_index_fund, other_etf_or_index_fund or other |
nfo_subscription_inr | decimal |
The limits in force today
- min debt or debt hybrid inr 200000000 INR
- min debt etf or index fund inr 100000000 INR
- min other etf or index fund inr 50000000 INR
- min other scheme inr 100000000 INR
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-min-aum-nfo-subscription
Instead of launching an NFO for an ETF, the AMC may contribute the initial fund for unit creation and later transfer the ETF units to market makers or other investors, subject to all provisions applicable to the launch of ETFs.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Seed an ETF with its own initial contribution and later transfer the units to market makers or other investors
When it applies
- Also subject to compliance with all applicable provisions for launch of ETFs
From the provisions
In Chapter 7 — GOVERNANCE NORMS
History
- Made
Can a machine check it?
Needs judgement (conduct). A liberty conditional on compliance with other provisions for ETF launches.
Not yet reviewed · extracted by a model from the text · ob-mfmc-min-aum-etf-seed-units
The AMC must specify in a scheme's SID achievable timelines for deploying the NFO funds as per the scheme's asset allocation, and garner funds in the NFO accordingly.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Specify achievable deployment timelines in the SID and garner NFO funds accordingly
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Whether a timeline is achievable and the NFO sized to it is judgement.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-sid-deployment-timelines
The AMC must deploy the funds garnered in every NFO within 30 business days from the date of allotment of units, or within a further 30 business days where the Investment Committee has extended the timeline.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within 30 business days from the date of allotment of units (a further 30 business days if the Investment Committee extends)
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 7.24.1(f)
What it requires
- Deploy the NFO funds as per the asset allocation
When it applies
- Within within 30 business days from the date of allotment
- Also applies to all NFOs (para 7.24.1(g))
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). The allotment and deployment dates are data; business days exclude weekends and the holidays supplied.
Its check
| Field | Type | What it is |
|---|---|---|
allotment_date | date | |
extension_granted (optional) | bool | the Investment Committee extended the timeline by 30 business days |
holidays (optional) | list<date> | comma-separated non-weekend holidays (YYYY-MM-DD); weekends are never business days |
deployed_on | date | date the funds were deployed as per the SID's asset allocation |
The limits in force today
- deployment business days 30 business days
- extension business days 30 business days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-deploy-within-30-business-days
If, in an exceptional case, the AMC cannot deploy the NFO funds within 30 business days, it must place before its Investment Committee written reasons, including details of its efforts to deploy them.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Place written reasons and the efforts made before the Investment Committee
When it applies
- When the AMC is not able to deploy the funds within 30 business days
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- Supervised by Investment Committee of the AMC
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). The reasons are a document whose adequacy is judged by the committee.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-deploy-delay-reasons-ic
The Investment Committee may extend the deployment timeline by 30 business days after examining the root cause of the delay, while making recommendations on ensuring deployment within 30 business days in future and monitoring them; it should not ordinarily grant an extension where the scheme's assets are liquid and readily available.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- an extension of up to 30 business days
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Examine the root cause and decide on a part or full extension of up to 30 business days
- Make and monitor recommendations to ensure deployment within 30 business days going forward
When it applies
- Threshold extension of up to 30 business days
- Unless not ordinarily where the assets for the scheme are liquid and readily available
From the provisions
In Chapter 7 — GOVERNANCE NORMS
History
- Made
Can a machine check it?
Needs judgement (approval-required). Whether to extend, and whether assets are liquid and readily available, are judgement.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-deploy-extension-ic
The trustees must monitor the deployment of NFO funds and take the steps required to ensure the funds are deployed within a reasonable timeframe.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Governance
- Frequency
- Ongoing
- Timeline
- funds deployed within a reasonable timeframe
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Monitor deployment of NFO funds and take steps to ensure timely deployment
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (conduct). "Reasonable timeframe" and the steps required are judgement.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-trustees-monitor-deployment
ProhibitionIf the NFO funds are not deployed as per the SID's asset allocation within the mandated and extended timelines, the AMC may not receive fresh flows into the scheme until they are.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- until the funds are deployed as per the asset allocation in the SID
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Receive no fresh flows into the scheme until the funds are deployed as per the asset allocation
When it applies
- When funds not deployed as per the SID's asset allocation within the mandated plus extended timelines
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). The timeline, the deployment date and the dates of fresh flows are data.
Its check
| Field | Type | What it is |
|---|---|---|
allotment_date | date | |
extension_granted (optional) | bool | the Investment Committee extended the timeline by 30 business days |
holidays (optional) | list<date> | comma-separated non-weekend holidays (YYYY-MM-DD); weekends are never business days |
deployed_on (optional) | date | date the funds were deployed, if they have been |
fresh_flow_accepted_on | date | date of the first fresh flow accepted after the timeline |
The limits in force today
- deployment business days 30 business days
- extension business days 30 business days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-undeployed-no-fresh-flows
ProhibitionIf the NFO funds remain undeployed beyond the mandated and extended timelines, the AMC may not levy any exit load on investors exiting the scheme after 60 business days of non-compliance with its asset allocation.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- for exits after 60 business days of not complying with the asset allocation
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Levy no exit load on investors exiting after 60 business days of non-compliance with the asset allocation
When it applies
- When funds not deployed within the mandated plus extended timelines
- Within exits after 60 business days of not complying with the asset allocation
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). The timelines, the exit date and the load charged are data.
Its check
| Field | Type | What it is |
|---|---|---|
allotment_date | date | |
extension_granted (optional) | bool | the Investment Committee extended the timeline by 30 business days |
holidays (optional) | list<date> | comma-separated non-weekend holidays (YYYY-MM-DD); weekends are never business days |
deployed_on (optional) | date | |
exit_date | date | |
exit_load_levied_pct | decimal |
The limits in force today
- deployment business days 30 business days
- extension business days 30 business days
- exit load free after business days 60 business days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-undeployed-no-exit-load
If the NFO funds are not deployed within the mandated and extended timelines, the AMC must inform all investors of the NFO, by e-mail, SMS or a similar mode, of the option to exit the scheme without exit load.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Inform all NFO investors of the option to exit without exit load
When it applies
- When funds not deployed within the mandated plus extended timelines
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). No time for the communication is set; its sending is a record.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-undeployed-inform-investors
The AMC must report any deviation in deploying NFO funds to the trustees at each of the stages of para 7.24.1(f).
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- at each of the stages of Para 7.24.1(f)
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Report deviation to the trustees at each stage
When it applies
- When funds not deployed within the mandated plus extended timelines
From the provisions
In Chapter 7 — GOVERNANCE NORMS
Whom else it names
- Supervised by Trustee Company
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). A report at each stage, with no day count set.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-undeployed-report-trustees
To manage NFO fund flows, the fund manager may extend or shorten the NFO period (except for ELSS schemes) based on the fund manager's view of market dynamics, availability of assets and ability to deploy the funds, subject to para 1.7.1 of the master circular.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Extend or shorten the NFO period
When it applies
- Also subject to compliance with para 1.7.1 of the master circular
What it does not reach
- Unless not for ELSS schemes
From the provisions
In Chapter 7 — GOVERNANCE NORMS
History
- Made
Can a machine check it?
Needs judgement (conduct). A discretionary power exercised on the fund manager's view of the market.
Not yet reviewed · extracted by a model from the text · ob-mfmc-nfo-fm-extend-shorten-period
Chapter 8 — SECONDARY MARKET ISSUES1
The offer document must disclose the extent and manner of the scheme's participation in derivative instruments and the risk factors, explained by suitable numerical examples.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose in the offer document the extent and manner of derivatives participation and the risk factors with numerical examples
When it applies
- When the scheme may participate in derivative instruments
From the provisions
In Chapter 8 — SECONDARY MARKET ISSUES
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Partly computable (disclosure-present). The presence of each disclosure is mechanical; whether the examples are suitable is judgement.
Its check
| Field | Type | What it is |
|---|---|---|
scheme_may_participate_in_derivatives | bool | whether the scheme may participate in derivatives |
od_discloses_extent_and_manner | bool | the offer document discloses the extent and manner of participation in derivatives |
od_discloses_risk_factors | bool | the offer document discloses the risk factors |
risk_factors_explained_with_numerical_examples | bool | the risk factors are explained by numerical examples |
numerical_examples_judged_suitable (optional) | bool | a reviewer's finding on whether the numerical examples are suitable; absent until judged |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-sec-derivatives-offer-document-disclosure
Chapter 14 — ADVERTISEMENTS3
For close-ended debt-oriented schemes, mutual funds/AMCs must make these additional disclosures in the SID/SAI and KIM without indicating the portfolio or yield, directly or indirectly: the credit evaluation policy for investments in debt securities; the sectors they will not invest in; the types of instrument the scheme proposes to invest in (CPs, CDs, treasury bills and the like); and floors and ceilings within a range of 5% of the intended allocation for each sub-asset class or credit rating.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Disclose the credit policy, excluded sectors, instrument types and allocation ranges in the SID/SAI and KIM
- Not indicate the portfolio or yield, directly or indirectly
When it applies
- Also close-ended debt-oriented schemes
- Threshold floor-to-ceiling range of at most 5% of the intended allocation per sub-asset class or rating
From the provisions
In Chapter 14 — ADVERTISEMENTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (disclosure-present). The disclosures' presence and each range's width are data in the offer documents.
Its check
| Field | Type | What it is |
|---|---|---|
is_close_ended_debt_scheme | bool | |
discloses_credit_evaluation_policy (optional) | bool | SID/SAI and KIM |
discloses_excluded_sectors (optional) | bool | |
discloses_instrument_types (optional) | bool | |
allocation_ranges (optional) | list<object> | each {sub_asset_class, floor_pct, ceiling_pct} |
indicates_portfolio_or_yield (optional) | bool |
The limits in force today
- max range width pct 5 %
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-adv-close-ended-debt-allocation-disclosure
After the NFO closes, the AMC must report the publicised percentage allocation and the final portfolio at the next meeting of the AMC and of the trustees.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Event Based – Others
- Frequency
- On an event
- Timeline
- in the next meeting of the AMC and of the trustees after the closure of the NFO
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Report the publicised allocation and the final portfolio at the next AMC and trustee meetings
When it applies
- When the NFO closes
- Within at the next meeting of the AMC and of the trustees
From the provisions
In Chapter 14 — ADVERTISEMENTS
Whom else it names
- Supervised by Board of directors of the AMC, Trustee Company
History
- Made
Can a machine check it?
Computable (disclosure-present). The report's place in the next meetings' papers is recorded.
Its check
| Field | Type | What it is |
|---|---|---|
reported_at_next_amc_board_meeting | bool | reported at the next meeting of the AMC's board |
reported_at_next_trustee_meeting | bool | reported at the next meeting of the trustees |
report_includes_publicised_allocation_and_final_portfolio | bool | the report gives the publicised allocation and the final portfolio |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-adv-nfo-allocation-report
ProhibitionVariations between the indicative portfolio allocation publicised and the final portfolio after the NFO are not permissible.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Build the final portfolio within the allocation publicised
When it applies
- When the NFO closes and the portfolio is built
From the provisions
In Chapter 14 — ADVERTISEMENTS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (threshold). The publicised floors and ceilings and the final allocation are figures.
Its check
| Field | Type | What it is |
|---|---|---|
allocations | list<object> | each {sub_asset_class, floor_pct, ceiling_pct, final_pct} |
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-adv-nfo-final-portfolio-no-variation
Chapter 15 — INVESTOR RIGHTS & OBLIGATIONS4
Any amount to be refunded to applicants under Regulation 32(3) must be refunded within 5 working days from the closure of the subscription list.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- within 5 working days from the closure of the subscription list
- Format
- None prescribed
- XBRL
- No
- Penalty
- Specified — Para 15.1.4
What it requires
- Refund the amount due to the applicants
When it applies
- When an amount becomes refundable to applicants under Regulation 32(3)
- Within within 5 working days of the closure of the subscription list
If it is not met
- If the refund is not made within five working days, the AMC is liable to pay the applicants interest at 15% per annum from the expiry of the five working days (Para 15.1.4).
From the provisions
In Chapter 15 — INVESTOR RIGHTS & OBLIGATIONS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (deadline). Two dates and a count of working days. The paragraph is passive; the AMC is taken as the bearer because Para 15.1.4 makes the AMC liable for late refunds.
Its check
| Field | Type | What it is |
|---|---|---|
subscription_closed_on | date | day the subscription list closed |
refunded_on | date | day the refund was made |
holidays (optional) | list<date> | holidays that are not working days, as YYYY-MM-DD dates, comma-separated; Saturdays and Sundays never count |
The limits in force today
- refund window working days 5 working days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-inv-nfo-refund-5wd
If refunds are not made within five working days of the closure of the subscription list, the AMC must pay the applicants interest at 15% per annum from the expiry of those five working days.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- interest at 15% per annum from the expiry of five working days from the closure of the subscription list
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Pay interest at 15% per annum for the period of delay in refund
When it applies
- When the refund is not made within five working days of the closure of the subscription list
- Threshold interest at 15% per annum from the expiry of five working days
From the provisions
In Chapter 15 — INVESTOR RIGHTS & OBLIGATIONS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Computable (arithmetic). The interest owed is amount x 15% x days of delay / 365; the day count (365) is not stated in the text and is an assumption held as a parameter.
Its check
| Field | Type | What it is |
|---|---|---|
subscription_closed_on | date | day the subscription list closed |
refunded_on | date | day the refund was made |
refund_amount (optional) | decimal | amount refunded, in rupees (needed when the refund is late) |
interest_paid (optional) | decimal | interest paid with the refund, in rupees (needed when the refund is late) |
holidays (optional) | list<date> | holidays that are not working days, as YYYY-MM-DD dates, comma-separated; Saturdays and Sundays never count |
The limits in force today
- refund window working days 5 working days
- delay interest rate pa 15 percent per annum
- days in year 365 days
Try this provision
Illustrative — not advice. The check reads only the figures you give it.
Not yet reviewed · extracted by a model from the text · ob-mfmc-inv-nfo-refund-delay-interest
Mutual Funds/AMCs must provide the ASBA facility, in addition to the other permissible modes of payment, to investors in every NFO; AMCs must ensure that RTAs make adequate arrangements to implement it, must make all relevant disclosures in the SAI, and must follow the SEBI circulars on ASBA to the extent applicable.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- for every NFO launched
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Provide the ASBA facility for every NFO
- Ensure the RTAs make adequate arrangements for ASBA
- Make the relevant ASBA disclosures in the SAI
- Follow the SEBI circulars on ASBA to the extent applicable
When it applies
- When an NFO is launched
From the provisions
In Chapter 15 — INVESTOR RIGHTS & OBLIGATIONS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (disclosure-present). Whether the facility was offered is a fact, but the adequacy of the RTAs' arrangements and the disclosures are judged.
Not yet reviewed · extracted by a model from the text · ob-mfmc-asba-nfo-facility
The banks on the Board's list must extend the ASBA facility for NFOs of mutual fund schemes to all eligible investors in MF units.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- Extend the ASBA facility for MF NFOs to all eligible investors
When it applies
- When an NFO of a mutual fund scheme
From the provisions
In Chapter 15 — INVESTOR RIGHTS & OBLIGATIONS
Whom else it names
- For the benefit of Investor
History
- Made
Can a machine check it?
Needs judgement (conduct). Availability to all eligible investors is conduct, not a figure.
Not yet reviewed · extracted by a model from the text · ob-mfmc-asba-bank-extend-facility
Chapter 20 — MUTUAL FUND LITE (MF LITE) FRAMEWORK4
Passive schemes floated by AMCs registered under the MF Lite framework must use the fast-track route for their SIDs.
ProcessSchemes: launch, offer documents and structureFunds, schemes and investmentCompare across regulations →
- Category
- Issue Management
- Frequency
- On an event
- Timeline
- The text sets none
- Format
- None prescribed
- XBRL
- No
- Penalty
- None stated
What it requires
- File the SIDs of passive schemes through the fast-track route
From the provisions
In Chapter 20 — MUTUAL FUND LITE (MF LITE) FRAMEWORK
Whom else it names
- Supervised by SEBI
History
- Made
Can a machine check it?
Needs judgement (conduct). A filing route with no number or date to test.
Not yet reviewed · extracted by a model from the text · ob-mfmc-mflite-fast-track-sid
Illustrative, not advice. A duty is what the extraction read in a provision; the provision itself is the law. Duties extracted by a model stay “not yet reviewed” until an editor has read them against the text, and so do their categories, frequencies, formats and penalties.